BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 17, 2025 at 8:00 PM

Updated September 18, 2025

Site work for an educational facility in Cedar City, Utah. Completed plans call for site work for a educational facility.

Questions Due Date: Sep 3rd 2025, 3:00 PM MDT Online Portal Contact Information: Scott Jensen, sgjensen@utah.gov INVITATIONAL Only contractors listed in the solicitation and who attend the mandatory meeting are allowed to bid on this project. The State of Utah - Division of Facilities Construction and Management (DFCM) is requesting bids for the construction of the referenced project: Project Description: New fencing & gate around campus. Brief Project Description: New fencing & gate around campus. This section of the specifications cover specific requirements, instructions, and conditions applicable to this project only, which are not covered by the General Conditions of the Construction Contract prepared by the Engineers Joint Contract Documents Committee. Should there be conflicting statements between this section and other sections of these specifications, this section shall govern. Should there be conflicting statements between the Standard General Conditions of the Construction Contract, these Specifications or the Utah Division ofFacilities Construction and Management (DFCM) Contracts Agreement. The order of precedence is as follows: . DFCM Contractors Agreement. These Specifications Standard General Conditions ofthe Construction Contract. • A code inspection report recommending that a certificate of occupancy be issued. Final report from the special inspection agency. Certificate offire clearance from the State Fire Marshall. Final approval from the State Elevator inspector, if applicable. N/A Final approval from the State boiler inspector, if applicable. N/A Report ofthe disinfection ofthe potable water system. IPC 610 N/A A Certificate ofCompliance from the approved fabricator, if applicable. IBC 1074.2.2 N/A A stamped and signed final report from the structural engineer when structural observation is required by IBC 1710. N/A A stamped and signed final report from the structural engineer when structural observation is required by IBC 1710. N/A An NFRC Certificate for fenestration without the NFRC label. N/A Final report from the special inspector and the mechanical engineer when smoke control is required. The reports must comply with IBC 909.18.8.3. N/A

Bid Results

Educational

$99,679.00

Public - State/Provincial

Site Work

10

5

4

3

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
18
Active Projects
7
Bidding Soon
168
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 16, 2025

October 16, 2025

Project location map

757 W 800 S, Cedar City, UT


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.