BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 16, 2025 at 8:00 PM

Updated October 17, 2025

Site work and new construction of an educational facility in East Ellijay, Georgia. Completed plans call for the construction of a educational facility; and for site work for a educational facility.

The Gilmer County Board of Education (GCBOE) (Owner) is soliciting Proposals from Construction Professionals/firms interested in providing Construction Professional (CP) services for the construction of a New PK-5 School. This Request for Proposal (RFP) seeks to identify potential providers of the above mentioned services. All respondents to this RFP are subject to instructions communicated in this document, and are cautioned to completely review the entire RFP and follow instructions carefully. The Owner reserves the right to reject any or all proposals, and to waive technicalities and informalities at their discretion. Project Delivery Method The Preferred Delivery Method for the Project will be Construction Manager-at-Risk (CM @ Risk), and, at a minimum, the Owner will also directly employ the services of a Design Professional in addition to the services of the CP. During pre-construction, the Contractor will be responsible for pricing, value engineering, as well as maintainability and constructability issues. The Owner reserves the right to adjust the schedule as the Owner deems necessary. Failure to attend a mandatory conference will automatically result in disqualification from the selection process. Deadline for written questions/requests for clarification ): 09/19/2025 at 10:00am The selection of the Contractor is anticipated to be finalized on 10/23/25. Preconstruction services are expected to begin immediately upon execution of the contract with the Contractor. Pre-Construction services are expected to begin upon execution of a Guaranteed Maximum Price (GMP) amendment to the Construction Professional Contract. (All of the dates herein are estimates which are subject to change.) Construction described will be tentatively performed June 1, 2026, and Substantially Completed by December 1, 2027.

Post-Bid

Educational

$32,192,030.00

Public - County

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
280
Active Projects
172
Bidding Soon
2,082
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 7, 2025

June 1, 2026

Project location map

32 McCutchen St, East Ellijay, GA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.