Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 4, 2025 at 8:00 PM
Updated November 8, 2025
Site work for a water / sewer project in Lyons, Colorado. Completed plans call for site work for a water / sewer project.
Reference Number 0000397490 The Watershed Center is soliciting proposals for design-build implementation river restoration project on North St. Vrain Creek titled Apple Valley River Restoration. The project is funded* via federal and state grant sources including Colorado Department of Public Health and Environment (CDPHE) Section 319 Nonpoint Source Program and Colorado Water Conservation Board (CWCB) Watershed Restoration Program, and Natural Resource Damages (NRD) Program Assessment Funds. Buyer Preferences, Guidelines & Requirements Participation Requirements - Disadvantaged Business Enterprise (DBE) - Minority Business Participation - Women-Owned Business Participation General Requirements - Bid Deposit Required - Contractors License Required - Federally Funded - Insurance Required - Material Safety Data Sheets Required - Samples Required - Training Required - Warranty Information Required Contract Term Through June 30, 2027 Question Deadline 09/23/2025 at 5:00 PM MT Questions are submitted online No, Written inquiries will be accepted until time. All questions and responses will be documented and posted to all interested parties by 5:00 PM MT on 6/28/2023. Inquiries should be made to Deb Hummel (dhummel@watershed.center) with the subject line titled: INQUIRY - Apple Valley Restoration. The Watershed Center reserves the right to reject any and all proposals, in part or in whole, and to award the proposal(s) to the most responsive and responsible design-build firm(s) as deemed in the best interest of The Watershed Center; further, the right is reserved to waive any formalities or informalities contained in said proposal(s). The Contractor shall finalize all necessary plans, designs, drawings and specifications for the Project, complete all construction work necessary to complete the construction of the Project, and furnish all equipment and materials needed for the completion of the Project in accordance with such plans, designs, drawings and specifications provided by LWOG. Strategies to develop a detailed budget and schedule for construction that meets funding limitations. Strategies to develop and implement a permitting compliance schedule and/or matrix. Strategies to provide effective and efficient construction oversight. Ensure and coordinate utility locates and minor temporary or permanent relocations prior to construction. Ensure a safe working environment on the project site. Strategies to perform field-fitting of restoration structures and document design changes. Strategies to comply with protocol and document activities related to decontamination of noxious weeds and aquatic nuisance species (see Section 4.3 for protocol). Ability to provide as-built report and supporting documents to document work that has been completed and to close out permits. Strategies for warranty administration for a period of 12 months from the date of closeout, including maintenance of planted and seeded vegetation.
Post-Bid
Water / Sewer
$850,000.00
Public - County
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
4
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 3, 2025
February 3, 2026
451 4th Ave, Lyons, CO
Related To This Project
Lyons, CO
Bid Date: Sep 30 2025
Lyons, CO
Bid Date: Oct 23 2025
Lyons, CO
Bid Date: Nov 07 2025
Lyons, CO
Bid Date: Sep 09 2025
Lyons, CO
Bid Date: Jun 05 2025
Lyons, CO
Bid Date: May 28 2025
Lyons, CO
--
Lyons, CO
Bid Date: Mar 18 2025
Lyons, CO
Bid Date: Mar 13 2025
Lyons, CO
Bid Date: Mar 03 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
