BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 6, 2025 at 7:00 PM

Updated November 7, 2025

Site work and paving for a mixed-use development in Lyons, Colorado. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

**As of November 6th, 2025, this project has not yet been awarded. The project is expected to be awarded by the end of November 30th, 2025.** Reference Number 0000398870 Town Project Number: 25-SRTS 3RD & STICKNEY-01 The Town of Lyons has acquired Federal funding through Safe Routes to School (SRTS) for design and construction of sidewalks on the east side of the elementary school. The design and construction run along 3rd Ave from Stickney to Main Street and some portions of Stickney running west. The design and construction will include sidewalk, curb and gutter, signing and striping, and necessary drainage improvements. The RFQ is for the scope of design services and construction administration. Question Deadline 09/29/2025 at 4:00 PM MT Questions are submitted online No 10/21/25 Tuesday Anticipated Award This is an optional but recommended pre-proposal meeting with an optional site walk at 2:00. Please review conceptual plans as there is another Federally funded project for stormwater improvements that will connnect to the Safe Routes to School project and both consultants will need to work together for connectivity. The preproposal for the stormwater project will be at 1:30 sith the site walk for both projects immediately after. Hand deliver proposals to (preferred method): Town of Lyons Attention: Justin Doles 432 5th Avenue Lyons, CO 80540 Or mail proposals to: US Postal Service Only: Town of Lyons Attention: Justin Doles PO Box 49 Lyons, CO 80540 Buyer Preferences, Guidelines & Requirements General Requirements - Contractors License Required - Insurance Required Bonding Requirements - Bid Bond 0.01 % - Performance Bond 0.01 % - Maintenance Bond 0.01 % - Surety Bond 0.01 % - Labor and Materials Bond 0.01 % - Payment Bond 0.01 % 1. Scope of Work: Design services including and not limited to environmental assessment, permitting assistance, public outreach, CDOT coordination and bid set for the Safe Routes to School 3 rd Ave and Stickney sidewalks, curb and gutter project. Construction Administration services during construction for assistance with requests for information (RFI's), submittal reviews, design adjustments and final as constructed plans. As per Adda 3, Project questions will be due on Monday September 29, 2025, by 4:00 PM. Answers will be posted no later than 4:00 PM October 1, 2025.

Post-Bid

Sidewalks / Parking Lot

$600,000.00

Public - City

Paving, Site Work

6

5

8

6

Subscribe For Documents

96 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
211
Active Projects
101
Bidding Soon
1,386
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 23, 2025

November 7, 2025

Project location map

3rd Ave, Lyons, CO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.