BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 8, 2025 at 7:00 PM

Updated December 9, 2025

Site work for a civil project in San Bernardino, California. Completed plans call for site work for a road / highway; and water / sewer project.

Response Types Line Items Bid forms Type of Award Lump Sum. Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00%. Pre-Bid Meeting No. Question Deadline 09/17/2025 at 4:00 PM PT Online Q&A Yes. The I-215 Bi-County Landscape and I-215 Segment-5 Landscape Projects. Both projects have similar scope which consist of providing California drought- tolerant planting with gravel and wood mulch in combination with rock boulders. In addition, the Project will include efficient irrigation and one year of plant establishment. General description of work: The work involves construction of landscaping improvements including trees, shrubs, groundcover plantings, gravel mulch and decorative boulders. Work also includes installation of irrigation systems consisting of irrigation controllers, remote control valves, backflow preventer assemblies, water meters and services, irrigation pipes and supply lines and other miscellaneous appurtenances and modification of existing electrical and communication systems. All plans are diagrammatic representations of existing facilities and proposed improvements. Actual locations of existing facilities may vary. Contractor shall be responsible for verifying existing conditions and making the necessary adjustments and modifications to complete the work as shown and specified. Proposed improvements shall be adjusted in the field based upon actual field conditions and setback requirements. Contractor shall be responsible for making the necessary adjustments and modifications to complete the work as shown and specified Please direct all questions regarding this Addendum No. 1 in writing to Jenny Holliday, Procurement Analyst III, at jholliday@gosbcta.com. Question Deadline 09/17/2025 at 4:00 PM PT All questions and requests for clarifications to this IFB or approved equal requests must be put in This Project is the combination of two Landscape Projects on Interstate 215 (I-215), the I-215 BiCounty Landscape and I-215 Segment-5 Landscape Projects. Both projects have similar scope which consist of providing California drought-tolerant planting with gravel and wood mulch in combination with rock boulders. In addition, the Project will include efficient irrigation and one year of plant establishment. writing and submitted to SBCTA electronically via online , and they must be received by SBCTA 08-0M94V, PNRSLN 6507(044)

Award

Roads / Highways

$8,601,921.00

Public - County

Site Work

209

11

16

5

Subscribe For Documents

38 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
535
Active Projects
91
Bidding Soon
3,623
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 15, 2025

December 4, 2025

Project location map

I-215, San Bernardino, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.