Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 15, 2025 at 8:00 PM
Updated September 16, 2025
This is a service / maintenance or supply contract in San Bernardino, California. Contact the soliciting agency for additional information.
Purpose The San Bernardino County Flood Control District is seeking Proposals from interested and qualified Proposers to prepare a Master Plan of Drainage (MPD) for the unincorporated area of Big Bear City to be used as a planning tool/resource for implementing future flood control infrastructure within MPD boundary. Please refer to Section V, Scope of Work, and Section VI, Proposal Submission, for additional information. Proposals must be submitted via hard copy with original signature (and one copy on a flash drive) submitted to the address indicated above. All Proposers must register with the ePro system prior to the date and time to submit the proposal or they will be disqualified. Contract Term Services to be provided under this Request for Proposals (RFP) are outlined under Section V, Scope of Work. The Contract period will be for a maximum of 3 years beginning on the day the contract is awarded and ending on the completion of the Services, or 3 years after the contract award date, whichever is earlier. Deadline for Submission of Questions 3:00 PM Local Time, August 27, 2025 Questions regarding the contents of this RFP must be submitted in writing in ePro on or before the Deadline for Submission of Questions. All questions will be answered and both the question and answer will be posted as an Addendum to the RFP in ePro. Date for Tentative Contract Award November 18, 2025 PROJECT DESCRIPTION 1. Project goals and objectives The District is seeking Proposals from interested and qualified Proposers to prepare a Master Plan of Drainage for the unincorporated area of Big Bear City. See Exhibit B for general study area. The MPD must include, at a minimum, the following sections: a. Executive Summary Section including, but not limited to, the basis of study, study approach, characteristics of the watershed, development of the master plan alternatives, issues and considerations, and conclusions and recommendations. b. Introduction Section including, but not limited to, the study area, purpose/general intent, goals and objectives, policies, stakeholders, Flood Control District Act compliance, facility designations (e.g. regional vs. secondary vs. local facility), and the use of study/disclaimer. c. Environmental Considerations and Regulatory Section including, but not limited to, policies and regulations, wildlife habitat, natural aesthetics, routine access for maintenance and improvements, and historical discussion. d. Hydrology Section including, but not limited to, an introduction, boundary development, watershed characteristics, hydrologic model parameter development, rational method studies, unit hydrograph studies, and hydrologic factors (land use, hydrologic soil groups, loss rate criteria, precipitation analysis, antecedent moisture condition (AMC), etc.). e. Existing Infrastructure Section including, but not limited to, existing drainage facilities and basin analyses, historical investigation, and deficiency analyses. f. Hydraulic Modeling, Design Criteria and Facility Sizing Section including, but not limited to, an introduction, discussion of closed conduits and open channel hydraulics and design criteria, alignments and proposed drainage facilities (brief discussion of each drainage system), basin considerations, debris yield and bulking factors, and design storm frequencies. g. Debris and Detention Basin Analysis Section including, but not limited to, locations, detention basin options, alternatives, and recommendations. h. Cost Estimate Section including, but not limited to, an introduction, assumptions, types of costs (construction, acquisitions, environmental mitigation), open channel costs, closed conduit costs, debris basin costs, contingencies, development fees analysis, and discussion of funding opportunities. This section provides general costs assumptions and drainage system specific costs are to be provided in a separate volume with the specific drainage system plans and profiles. i. Priority Recommendations Section including, but not limited to, general recommendations and specific project recommendations and priorities. j. Conclusion and Recommendations Section including, but not limited to, an introduction, study conclusions and final recommendations. Deadlilne for submission of Questions : 3:00 PM, September 4, 2025.
Conceptual
Water / Sewer
Public - County
Service, Maintenance and Supply
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 2, 2026
Multiple Locations, San Bernardino, CA
Related To This Project
San Bernardino, CA
Bid Date: Sep 26 2025
San Bernardino, CA
Bid Date: Oct 09 2025
San Bernardino, CA
Bid Date: Oct 09 2025
San Bernardino, CA
Bid Date: Oct 02 2025
San Bernardino, CA
--
San Bernardino, CA
Bid Date: Oct 02 2025
San Bernardino, CA
Bid Date: Oct 17 2025
San Bernardino, CA
Bid Date: Nov 05 2025
San Bernardino, CA
Bid Date: Oct 09 2025
San Bernardino, CA
Bid Date: Sep 11 2025
San Bernardino, CA
Bid Date: Oct 10 2025
San Bernardino, CA
Bid Date: Sep 18 2025
San Bernardino, CA
Bid Date: Oct 15 2025
San Bernardino, CA
Bid Date: Oct 15 2025
San Bernardino, CA
Bid Date: Sep 30 2025
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
