Published October 15, 2025 at 8:00 PM
Updated October 16, 2025
Site work for a mixed-use development in Pella, Iowa. Completed plans call for site work for a fitness / recreation center; and water / sewer project.
Construct Indoor Rec Center Sanitary Sewer Improvements including all labor, material and equipment for approximately 1,265 linear feet of 8" diameter sanitary sewer installed in open cut, 967 linear feet of 4" force main installed in open cut, 260 linear feet of 4" force main trenchless installation, sanitary sewer service lines and connections, precast concrete manholes, submersible lift station, valve manhole, control building, excavation, backfill, electrical and control, surface restoration and associated improvements and miscellaneous associated work, including cleanup. Each proposal shall be made out on a blank form furnished by the municipality and must be accompanied in a sealed envelope by either (1) a certified or cashier's check drawn on a solvent Iowa bank or a bank chartered under the laws of the United States or a certified share draft drawn on a credit union in Iowa or chartered under the laws of the United States, in an amount equal to ten percent (10%) of the bid, or(2) a bid bond executed by a corporation authorized to contract as a surety in the State of Iowa, in the penal sum of ten percent (10%) of the bid. The successful bidder will be required to furnish a bond in an amount equal to one hundred percent (100%) of the contract price, said bond to be issued by a responsible surety approved by the City Council and shall guarantee the faithful performance of the contract and the terms and conditions therein contained and shall guarantee the prompt payment for all materials and labor and protect and save harmless the City from claims and damages of any kind caused by the operations of the Contractor, and shall guarantee the work against faulty workmanship and materials for a period of four (4) years after its completion and acceptance by the City Council. The work shall commence within ten (10) calendar days as set out in written Notice to Proceed. The Notice to Proceed is anticipated to be issued on or about October 30, 2025. All gravity sewers shall be installed, backfilled, televised, and satisfactorily air tested including, manholes, lift station wet well, and lift station valve manhole by March 20, 2026. All force main piping shall be installed, backfilled and satisfactorily tested by April 30, 2026. All work, including surface restoration, shall be completed by November 20, 2026. Liquidated damages in the amount of Five Hundred Dollars ($500.00) per calendar day may be assessed for each day all gravity sewers are not installed, backfilled, televised, and satisfactorily air tested including manholes, lift station wet well, lift station valve manhole after March 20, 2026. Liquidated damages in the amount of Three Hundred Dollars ($300.00) per calendar day may be assessed for each day all force main piping is not installed, backfilled, and satisfactorily tested after April 30, 2026. Liquidated damages in the amount of Five Hundred Dollars ($500.00) may be assessed for each calendar day all work remains uncompleted after the end of the contract period. Separate damage assessments may be assessed for each of the separate completion dates. The Council reserves the right to reject any or all bids and to waive informalities or technicalities in any bid. Plans and specifications shall be interpreted by Engineer.
Award
Water / Sewer
$1,108,552.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 30, 2025
October 30, 2025
281 Baseline Dr, Pella, IA
Related To This Project
Pella, IA
Bid Date: Jan 13 2026
Pella, IA
Bid Date: Aug 12 2025
Pella, IA
Bid Date: Aug 05 2025
Pella, IA
Bid Date: Jul 29 2025
Pella, IA
Bid Date: Jul 29 2025
Pella, IA
Bid Date: Jun 26 2025