Site work for a civil project in Saint Augustine Beach, Florida. Completed plans call for site work for a water / sewer project.

Barrier Island Lift Station Hardening The Scope of Work for this project is construction of rehabilitating and hardening the Barrier Island lift stations along the coastal low-lying areas to improve the wastewater collection systems resiliency and protect critical infrastructure from stronger and more frequent storms and coastal sea-level rise. This project is funded under Florida Department of Environmental Protection (FDEP) Grant Agreement No. HA001 (CSFA No. 37.114 Hurricane Stormwater and Wastewater Assistance. Package D Locations of Lift Stations: - Bristol Place, 101 Annapolis Lane, Ponte Vedra Beach, FL 32082 - Ponce de Leon Villas, 24 Fountain of Youth Boulevard, St. Augustine, FL 32080 - Sea Ranch, 2129 Reef Drive, St. Augustine, FL 32080 The County's DesignatedPoint of Contactfor this IFB is Diana M. Fye, BAS, NIGP-CPP, CPPB, Senior Procurement Coordinator, St. Johns County Purchasing Department. Anyand all questions and/or inquiries shallbe directedto Ms. Fye, in writing, via email at dfye@sjcfl.us. Inthe eventtheDesignatedPoint ofContactis absent or otherwise unavailable for more than three (3) business days, firms may contact RichardPoulin, Procurement Coordinator at rpoulin@sjcfl.us. Any and all questions related to this project shall be directed, in writing, to the Designated Point of Contact. Questions are due no later than Four o'clock (4:00PM) EDST on Wednesday, September 17, 2025, s The completed Work will provide the Owner with upgrades and modifications to the Lift Stations and generally includes the following work elements for this wastewater pumping system: 1. Bristol Place (101 Annapolis Lane) a. Bypass pumping of the influent wastewater and discharge into the existing force main during the duration of pump station demolition/construction activities. b. Removal/demolition of existing piping as shown in the drawings. c. Removal/demolition of existing chainlink fence and gate. d. Removal and disposal of existing gravel. e. Removal/demolition of existing wetwell hatch. f. Removal/demolition of wood electrical post. g. Relocation of existing backflow preventer and hose bib. h. Installation of 316 SS piping, fittings and associated appurtenances. i. Installation of bypass pump and associated electrical work. j. Installation of watertight wet well hatch. k. Installation of electrical equipment as shown in the drawings. l. Installation of chainlink fence and access gate. m. Installation of new concrete for slab and equipment pad. n. Installation of stainless steel/aluminum electrical rack. o. Installation of landscaping. 2. Ponce de Leon Villas (24 Fountain of Youth Boulevard) a. Bypass pumping of the influent wastewater and discharge into the existing force main during the duration of pump station demolition/construction activities. b. Removal/demolition of existing piping and fittings as shown in the drawings. c. Removal/demolition of existing chain link fence. d. Removal/demolition of existing wetwell hatch. e. Installation of 316 SS piping, fittings and associated appurtenances. f. Installation of bypass pump and associated electrical work. g. Installation of watertight wet well hatch. h. Installation of chain link fence to match existing. i. Installation of new concrete for slab and equipment pad. 3. Sea Ranch (2129 Reef Drive) a. Bypass pumping of the influent wastewater and discharge into the existing force main during the duration of pump station demolition/construction activities. b. Removal/demolition of existing piping and fittings as shown in the drawing. c. Removal/demolition of palm tree. d. Remove and dispose of existing gravel. e. Installation of 316 SS piping, fittings and associated appurtenances f. Installation of bypass pump and associated electrical work. g. Installation of watertight wet well hatch. h. Installation of bollards. i. Installation of new concrete slab and equipment pad.

Award

Water / Sewer

$649,921.00

Public - County

Site Work

19

12

2

9

Subscribe For Documents

54 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
216
Active Projects
97
Bidding Soon
1,521
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 8, 2025

November 7, 2025

Project location map

Multiple Locations, Saint Augustine Beach, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.