Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published October 16, 2025 at 8:00 PM
Updated October 17, 2025
Site work for a civil project in Saint Augustine Beach, Florida. Completed plans call for site work for a water / sewer project.
Barrier Island Lift Station Hardening The Scope of Work for this project is construction of rehabilitating and hardening the Barrier Island lift stations along the coastal low-lying areas to improve the wastewater collection systems resiliency and protect critical infrastructure from stronger and more frequent storms and coastal sea-level rise. This project is funded under Florida Department of Environmental Protection (FDEP) Grant Agreement No. HA001 (CSFA No. 37.114 Hurricane Stormwater and Wastewater Assistance. Package D Locations of Lift Stations: - Bristol Place, 101 Annapolis Lane, Ponte Vedra Beach, FL 32082 - Ponce de Leon Villas, 24 Fountain of Youth Boulevard, St. Augustine, FL 32080 - Sea Ranch, 2129 Reef Drive, St. Augustine, FL 32080 The County's DesignatedPoint of Contactfor this IFB is Diana M. Fye, BAS, NIGP-CPP, CPPB, Senior Procurement Coordinator, St. Johns County Purchasing Department. Anyand all questions and/or inquiries shallbe directedto Ms. Fye, in writing, via email at dfye@sjcfl.us. Inthe eventtheDesignatedPoint ofContactis absent or otherwise unavailable for more than three (3) business days, firms may contact RichardPoulin, Procurement Coordinator at rpoulin@sjcfl.us. Any and all questions related to this project shall be directed, in writing, to the Designated Point of Contact. Questions are due no later than Four o'clock (4:00PM) EDST on Wednesday, September 17, 2025, s The completed Work will provide the Owner with upgrades and modifications to the Lift Stations and generally includes the following work elements for this wastewater pumping system: 1. Bristol Place (101 Annapolis Lane) a. Bypass pumping of the influent wastewater and discharge into the existing force main during the duration of pump station demolition/construction activities. b. Removal/demolition of existing piping as shown in the drawings. c. Removal/demolition of existing chainlink fence and gate. d. Removal and disposal of existing gravel. e. Removal/demolition of existing wetwell hatch. f. Removal/demolition of wood electrical post. g. Relocation of existing backflow preventer and hose bib. h. Installation of 316 SS piping, fittings and associated appurtenances. i. Installation of bypass pump and associated electrical work. j. Installation of watertight wet well hatch. k. Installation of electrical equipment as shown in the drawings. l. Installation of chainlink fence and access gate. m. Installation of new concrete for slab and equipment pad. n. Installation of stainless steel/aluminum electrical rack. o. Installation of landscaping. 2. Ponce de Leon Villas (24 Fountain of Youth Boulevard) a. Bypass pumping of the influent wastewater and discharge into the existing force main during the duration of pump station demolition/construction activities. b. Removal/demolition of existing piping and fittings as shown in the drawings. c. Removal/demolition of existing chain link fence. d. Removal/demolition of existing wetwell hatch. e. Installation of 316 SS piping, fittings and associated appurtenances. f. Installation of bypass pump and associated electrical work. g. Installation of watertight wet well hatch. h. Installation of chain link fence to match existing. i. Installation of new concrete for slab and equipment pad. 3. Sea Ranch (2129 Reef Drive) a. Bypass pumping of the influent wastewater and discharge into the existing force main during the duration of pump station demolition/construction activities. b. Removal/demolition of existing piping and fittings as shown in the drawing. c. Removal/demolition of palm tree. d. Remove and dispose of existing gravel. e. Installation of 316 SS piping, fittings and associated appurtenances f. Installation of bypass pump and associated electrical work. g. Installation of watertight wet well hatch. h. Installation of bollards. i. Installation of new concrete slab and equipment pad.
Award
Water / Sewer
$649,921.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 8, 2025
November 7, 2025
Multiple Locations, Saint Augustine Beach, FL
Related To This Project
Saint Augustine Beach, FL
Bid Date: Sep 17 2025
Saint Augustine Beach, FL
Bid Date: Nov 17 2025
Saint Augustine Beach, FL
Bid Date: Oct 15 2025
Saint Augustine Beach, FL
Bid Date: Oct 15 2025
Saint Augustine Beach, FL
Bid Date: Oct 21 2025
Saint Augustine Beach, FL
--
Saint Augustine Beach, FL
Bid Date: Jun 29 2026
Saint Augustine Beach, FL
Bid Date: Sep 24 2025
Saint Augustine Beach, FL
Bid Date: Sep 09 2025
Saint Augustine Beach, FL
Bid Date: Sep 18 2025
Saint Augustine Beach, FL
Bid Date: Sep 04 2025
Saint Augustine Beach, FL
Bid Date: Oct 22 2025
Saint Augustine Beach, FL
Bid Date: Oct 09 2025
Saint Augustine Beach, FL
Bid Date: Nov 05 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
