Published February 19, 2026 at 7:00 PM

Updated February 20, 2026

Demolition and site work for a pre-engineered storage facility in Belle River, Prince Edward Island. Completed plans call for the demolition of a pre-engineered storage facility; and for site work for a pre-engineered storage facility.

Demolition Former Storage Building - Wood Islands. Demolition and removal of existing building and associated items; including all footings, piers, foundation walls (note the foundation wall includes piers for the exterior wall pilasters), floor slabs, walls, roof, steps, decks, ramps etc. The contractor to provide water trucks with pumps and hoses, as well as a continuous supply of water, required to control and minimize any dust escaping the from the demolition site. Water shall be sprayed on the area being demolished during all demolition work, as well as material sorting and loading activity. At the end of each workday the contractor shall clean all dirt and debris from the paved driveway that is used by trucks for hauling material from and to the demolition site. Demolition of the former Storage Building shall include removal and disposal of all materials off-site, including those materials containing lead and PCBs. All material disposal is to be completed in accordance with applicable laws and regulations. The contractor is to install the silt fence, that is toed into the existing ground, in the location shown on the site plan. Supply and placement of compacted Select Borrow fill and topsoil in areas excavated and within the footprint of the building, to a finish grade that has provides drainage and blends into the adjacent existing finish grades around the building. Compaction testing will be carried out by a testing agency engaged by the Owner. Site reinstatement, including final grading, topsoil and grass seeding. Prior to placing any Select Borrow material the excavated site must be inspected by the DTI representative, to verify that all construction debris, including concrete material, has been removed from the site. The contractor is to provide 24 hours advance notice of the required inspection. Any additional information can be obtained by contacting Foster Millar, at 902- 368-6126 or jfmillar@gov.pe.ca Obtain Bid Documents Online from https://secure.cinet.ca/project/info/277e8e70-8980-11f0-a8a4-936d558473c2

Award

Warehouse / Distribution - Pre-Engineered Storage Building

$74,000.00

Public - State/Provincial

Demolition, Site Work

5

7

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1
Active Projects
1
Bidding Soon
14
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 25, 2025

November 3, 2025

Project location map

173 Wood Islands Park Rd, Belle River, PE

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.