BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 18, 2025 at 8:00 PM

Updated September 26, 2025

Site work and new construction of an educational facility in San Diego, California. Completed plans call for the construction of a educational facility; and for site work for a educational facility.

Project Information: GMP No. 01 1. Contract Number: LB25-0686-39-A1-G1 (GMP No. 01) 2. Project Name: Birney Elementary School Interim Housing 3. Project Estimate: $1.5 Million 4. Schedule: January 2026 - July 2026 5. Project Description: The scope of work includes the providing of five relocatable buildings: (1) 48'x40' Administration Building, (1) Restroom Building, and (3) 24'x40' Classroom Buildings. Scope includes selective underground utility work, electrical power and low voltage systems, and signage. RFI DEADLINE: Submit RFI's via email to Jianna Prevost at bidding@flintbuilders.com no later than Friday September 5, 2025 by 2 pm. SUBCONTRACTOR DISTRICT PREQUALIFICATION: Prequalifications are due to the District by Thursday September 11, 2025. The Work shall be conducted in 1 phase, with each phase substantially complete as indicated: 1. Phase 1 - installation of 4 relocatable classroom buildings and 1 relocatable restroom building to serve as interim housing. Work of this phase shall commence after the Notice to Proceed by 12/08/2025 and be substantially complete and ready for occupancy by end of Summer 2026.WORK BY DISTRICT A. General: Cooperate fully with District so work may be carried out smoothly, without interfering with or delaying work under this Contract or work by District. Coordinate the Work of this Contract with work performed by District. B. Concurrent Work: District will perform the following construction operations at Project site. Those operations will be conducted simultaneously with work under this Contract. 1. Rekeying and locks 2. Final Intrusion System Tie In. 3. Security Camera Installation 4. Installation of Furniture and Equipment noted as Owner Furnished and Owner installed. 5. Installation of digital displays. 6. District signs. PAYMENT AND PERFORMANCE BONDS: Upon review of prequalification forms Flint Design Build, LLC dba FLINT reserves the right to require 100% Payment and Performance Bonds. The District reserves the right to reject any and all bids and to waive any irregularities or informalities in any bids or in the bidding process. No bidder may withdraw his bid for a period of 90 days after the date set for the opening of bids. This project is the Interim Housing portion of a comprehensive campus modernization. Work includes the providing of five relocatable buildings: (1) 48'x40' Administration Building, (1) Restroom Building, and (3) 24'x40' Classroom Buildings. Scope includes selective underground utility work, electrical power and low voltage systems, and signage. The project duration is approximately five (5) months, with an estimated construction value of $1.5 million. The project is subject to a Project Stabilization Agreement. Cut-off for RFIs: 09/05/2025 @ 02:00 PM All inquiries regarding this bid should be sent in the messages section of Building Connected.

Post-Bid

Educational

$1,500,000.00

Public - City

New Construction, Site Work

163

35

22

4

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
74
Active Projects
3
Bidding Soon
868
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 25, 2025

December 1, 2025

Project location map

4345 Campus Ave, San Diego, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.