BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 24, 2025 at 7:00 PM

Updated November 25, 2025

Site work for a water / sewer project in Port Wentworth, Georgia. Completed plans call for site work for a water / sewer project.

**As of November 24, 2025 , this project has not yet been awarded. A timeline for award has not yet been established. The work to be done consists of furnishing all materials, equipment and labor for the construction of: Construction of approximately 4,541 L.F. of 12-inch force main, 635 L.F. of 12-inch fusible PVC by slipline, 2,440 L.F. of 12-inch fusible PVC by directional bore, 255 L.F. of 12-inch ductile iron force main, 360 L.F. of 16- inch fusible PVC casing by directional bore, 245 L.F. of 16-inch steel casing by jack and bore, 5 combination vacuum and air release valve manholes with appurtenances and storm water monitoring. Time allotted for this work is 240 consecutive calendar days for substantial completion and 270 days for final completion. Proposals for the complete work in one general contract shall be made on the proposal form provided and shall contain prices in words and figures for the work bid on. The project is proposed to be funded with local allocation of American Rescue Plan Act and City funds. All requirements and conditions apply. No submitted bid may be withdrawn after the scheduled closing time for receipt of bids for a period of sixty (60) days All Bidders must have a State of Georgia Utility Contractor License and must employ a state Utility Manager certificate holder who will have oversight of all the work. All proposals shall be accompanied by a Bid Bond drawn in favor of the City of Port Wentworth, Georgia, in the amount of at least 5% of the lump sum bid for the complete work; such Bid Bond representing that the Bidder, if awarded the contract, will promptly enter into a contract and furnish Performance Bond and Payment Bond as provided by law and approved by the Attorney for the City of Port Wentworth, Georgia. Each bond shall be equal to 100% of the contract amount. The Bid Bond shall be forfeited to the City of Port Wentworth, Georgia as liquidated damages if the Bidder fails to execute the contract and provide Performance and Payment Bonds within 10 days after being notified that he has been awarded the contract. Drawings and Specifications are open to public inspection at the office of the City of Port Wentworth, Georgia and at the offices of Turnipseed Engineers in Augusta and Atlanta, Georgia. The Owner reserves the right to reject any or all bids and to waive informalities.

Bid Results

Water / Sewer

$1,988,044.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
149
Active Projects
63
Bidding Soon
792
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 23, 2025

October 23, 2025

Project location map

Multiple Locations, Port Wentworth, GA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.