BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 14, 2025 at 8:00 PM

Updated October 15, 2025

Renovation of a fire / police facility in Mandan, North Dakota. Completed plans call for the renovation of a fire / police facility.

. Bids which do not comply with the Bond and Licensing provisions and any deficient bid submitted will be resealed and returned to the Bidder. All Bidders will be notified in writing within seven (7) days of the bid date of the selection of successful Contractor along with a bid tabulation of all bid submittals. All bids shall be in accordance with the Contract Documents. Bona fide Prime Contract Bidders may secure copies of the proposed Contract Documents from the Sheriff s Office. In compliance with the laws of the state of North Dakota, each Contractor must be licensed for the highest amount of his bid as stated in Section 43-07-12 of the North Dakota Century Code. All bids must be accompanied by a separate envelope containing the contractor s license and bid security complying with Section 48-01.2-05 of the North Dakota Century Code. The bid security must be in a sum equal to five (5%) percent of the full amount of the bid; including all add Alternates, and must be in the form of a bidder s bond. The copy of the contractor s license or Certificate of Renewal thereof issued by the Secretary of State must be enclosed in the required bid bond envelope complying with Section 43-07-12 of the North Dakota Century Code. No bid may be read or considered if the bid does not fully comply with the requirements of Section 48-01.2-05 and that any deficient bid submitted must be resealed and returned to the bidder immediately. MORTON COUNTY does not discriminate on the basis of race, color, national origin, sex, religion, age, or disability in employment or the provision of services, and complies with the provisions of the North Dakota Human Rights Act. The Owner reserves the right to reject any and all bids and rebid the project until a satisfactory bid is received in accordance with 48-01.2-07. The Owner further reserves the right to hold all bids for a period of THIRTY (30) DAYS AFTER THE DATE OF THE OPENING.

Post-Bid

Fire / Police

$200,000.00

Public - County

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
27
Active Projects
16
Bidding Soon
194
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 30, 2025

October 30, 2025

Project location map

205 1st Ave NW, Mandan, ND

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.