Published November 11, 2025 at 7:00 PM

Updated November 24, 2025

Site work, paving and new construction of a mixed-use development in Pleasant Hill, Iowa. Completed plans call for site work for a 17,152-square-foot, one-story above grade water / sewer project; sidewalk / parking lot; for paving for a sidewalk / parking lot; for the construction of a educational facility; and educational facility.

Bids Rejected - A. The Work of Project is defined by the Contract Documents and includes, but is not limited to, the following 1. New construction of a bus maintenance facility. Work includes related mechanical and electrical construction, site development, site utilities, and site paving. B. Type of Contract: 1. Project will be constructed under a single prime contract. Question Deadline 09/19/2025 Should a bidder find discrepancies, ambiguities, or omissions in the documents; should they find work shown but not specified; or specified but not shown; or should they be in doubt as to any meaning, they shall immediately notify the Architect, in writing, at least 10 days before the closing of bids. New construction of a bus maintenance facility. Work includes related mechanical and electrical construction, site development, site utilities, and site paving. Each bid shall be submitted on the Bid Form provided with the Bidding Documents and shall be accompanied by bid security as set forth in the Instructions to Bidders, in the amount of five (5) percent of the total bid. Performance Bond Requirement: 100% of contract amount. The work of this Contract shall be substantially completed on or before the following dates: New Building and Related Site Work: Work may commence on site on October 15, 2025; substantially complete the work by August 17, 2026. Final Completion by September 28, 2026. Phase 1 Asphalt: Work may commence on site on June 1, 2026; substantially complete the work by August 17, 2026. Phase 2 Asphalt and Building Demolition: Work may commence on site after Substantial Completion of new building and sitework; substantially complete the work by October 30, 2026. To the extent permitted by law, the Owner reserves the right to waive minor irregularities and to reject any and all bids.

Bid Results

Educational

$600,000.00

Public - County

New Construction, Paving, Site Work

60

27

64

3

Subscribe For Documents

101 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
143
Active Projects
102
Bidding Soon
1,117
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 30, 2025

October 15, 2025

Project location map

8443 N E University Ave, Pleasant Hill, IA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.