Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 29, 2025 at 8:00 PM
Updated October 31, 2025
Renovation of a water / sewer project in Craig, Colorado. Completed plans call for the renovation of a water / sewer project.
**As of October 29th, 2025, the project was awarded to Brimhall Industrial, with an awarded amount of $45,238.28** Reference Number 0000397799 The City of Craig invites qualified vendors to submit responses to this request for proposal (RFP) for refurbishment of one, Model 300 Allis Chalmers centrifugal pump. (pump motor not included). The current seals are to be replaced with Chesterton 442 split mechanical seals. Shipping and delivery prices should be included in the RFP. City staff will remove the pump to be ready for packaging and truck shipment. Question Deadline 09/30/2025 at 4:30 PM MT Questions are submitted online No, Any explanation desired by a Vendor must be requested of the City representative in writing, Questions may be sent to Carl Ray cray@ci.craig.co.us The bids shall be completely filled out on the bid forms provided. Bids shall be addressed to the City of Craig and shall have the name of the bidder and "Allis Chalmers Pump Refurbishment" written thereon. Failure to comply with the provisions of this paragraph will be cause for rejection of bid. No bid shall be withdrawn after opening the bid without the consent of the City of Craig, for a period of 30 days after the scheduled time for opening bids. The City of Craig, Colorado reserves the right to reject any or all bids and to waive any informality in the bidding. The pump included in this RFP moves raw sewage water from an influent wet well to an aeration basin and usually operates around 5 psig. We have four pumps that perform this function of which two are considered redundant. The equipment is refurbished on an approximate 15- year cycle, however the pump in question was submerged in untreated wastewater 6 years ago and lessened the life of pump components. Due to the unique arrangement of the intake and discharge piping, it is difficult to find another pump that would be a direct replacement without requiring a re-design of the piping.
Award
Water / Sewer
$45,238.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 15, 2025
November 14, 2025
2301 W 1st St, Craig, CO
Related To This Project
Craig, CO
Bid Date: Jan 11 2021
Craig, CO
Bid Date: Nov 10 2025
Craig, CO
Bid Date: Dec 02 2025
Craig, CO
Bid Date: Dec 02 2025
Craig, CO
Bid Date: Dec 03 2025
Craig, CO
Bid Date: Jan 14 2026
Craig, CO
Bid Date: Feb 05 2026
Craig, CO
Bid Date: Jan 05 2026
Craig, CO
Bid Date: Sep 02 2025
Craig, CO
Bid Date: Sep 08 2025
Craig, CO
Bid Date: Sep 03 2025
Craig, CO
Bid Date: Aug 21 2025
Craig, CO
Bid Date: Aug 06 2025
Craig, CO
Bid Date: Aug 07 2025
Craig, CO
Bid Date: Aug 07 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
