Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 12, 2025 at 8:00 PM
Updated September 13, 2025
Site work for a water / sewer project in Eloy, Arizona. Conceptual plans call for site work for a water / sewer project.
A 36-inch gravity sewer main extending approximately 1,800 linear feet, complete with four strategically placed manholes, represents a significant upgrade to wastewater management infrastructure. This type of project often involves dismantling an outdated pipeline to improve flow efficiency and system performance. Replacing the old line with a new 36-inch sewer main ensures a more reliable and consistent flow, reducing the risk of backups, overflows, and related service interruptions. The new sewer main, designed to utilize gravity for wastewater movement, enhances the overall capacity of the system, enabling it to handle increased volumes more effectively and with fewer operational issues. The inclusion of four manholes spaced along the 1,800-foot main line provides essential access points for inspection, maintenance, and emergency repairs, facilitating the long-term management and upkeep of the sewer system. As of September 12, 2025, this project is included in the City of Eloy's FY 2026-2031 CIP. Information regarding a design firm and the general contractor selection timeline has not been disclosed. Although a firm timeline for construction has not been determined, design is not expected to start prior to fiscal year 2026. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Water / Sewer
$6,930,000.00
Public - City
Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 1, 2027
W Battaglia Rd & 11 Mile Corner, Eloy, AZ
Related To This Project
Eloy, AZ
--
Eloy, AZ
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
