Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 31, 2025 at 8:00 PM
Updated November 1, 2025
Site work and paving for a road / highway in Center Line, Michigan. Completed plans call for site work for a road / highway; and for paving for a road / highway.
**As of October 31, 2025, the project was awarded to P.K. Contracting, LLC, with an awarded amount of $82,500.85.** Reference Number 0000397797 The work to be performed under this contract consists of preparing a road diet on Van Dyke Ave between Voerner Street and Stephens Road that reduces the lanes from 7 to 5. The approximate quantities involved in this work are as follows: Pavt Mrkg, Polyurea, For On-Street Parking, 4 inch, White 6568 Ft Pavt Mrkg, Polyurea, 12 inch, Cross Hatching, White 1731 Ft Rem Spec Mrkg 109 Sft Pavt Mrkg, Longit, 6 inch or Less Width, Rem 2667 Ft Pavt Mrkg, Polyurea, 6 inch, White 801 Ft Pavt Mrkg, Polyurea, 4 inch, White 150 Ft Sign, Type IIIA 47 Sft Post, Steel, 3 pound 35 Ft Pavt Mrkg, Polyurea, Stop 6 Ea Pavt Mrkg, Polyurea, Bus 6 Ea Pavt Mrkg, Polyurea, Rt Turn Arrow Sym 2 Ea Sign, Type IIIB 18 Sft Band, Sign 4 Ea Sign, Type III, Rem 2 Ea _Pavt Mrkg, Transit Lane, Red 1512 Sft Question Deadline 09/26/2025 at 4:00 PM ET Questions are submitted online No , via email at lurban@aewinc.com for any specific questions regarding the bidding documents. Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Maintenance Bond 100 % - Surety Bond 100 % - Labor and Materials Bond 100 % - Payment Bond 100 % Each proposal shall be accompanied by a certified check in the amount of five percent (5%) of the proposal, payable to the City of Center Line, as security for the acceptance of the contract. A bid bond on the Michigan Standard Form, issued by an approved Surety Company, may be furnished in lieu of a certified check. General Requirements - Bid Deposit Required - Certification/Training - Contractors License Required - Installation Required - Insurance Required - Material Safety Data Sheets Required - Spill Containment Plan - Warranty Information Required PRE-QUALIFICATION Contractor must have at least five (5)years of experience, as stated in Supplementary Instruction to Bidders, with proper excavation and disposal of Underground Fuel Storage Tanks. Contractor should also be certified to work around hazardous materials. All disposal of spoils shall be taken to certified facility to accept such materials. No bid may be withdrawn for a period of Sixty (60) calendar days after the receipt of bids.
Award
Roads / Highways
$82,501.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 2, 2025
November 3, 2025
Van Dyke Ave, Center Line, MI
Related To This Project
Center Line, MI
Bid Date: Nov 14 2025
Center Line, MI
Bid Date: Nov 12 2025
Center Line, MI
Bid Date: Dec 03 2025
Center Line, MI
Bid Date: Dec 03 2025
Center Line, MI
Bid Date: Dec 03 2025
Center Line, MI
Bid Date: Dec 03 2025
Center Line, MI
Bid Date: Dec 03 2025
Center Line, MI
Bid Date: Jan 16 2026
Center Line, MI
Bid Date: Aug 05 2025
Center Line, MI
Bid Date: Jun 18 2025
Center Line, MI
Bid Date: Jun 17 2025
Center Line, MI
Bid Date: Mar 21 2025
Center Line, MI
Bid Date: Mar 07 2025
Center Line, MI
Bid Date: Feb 12 2025
Center Line, MI
Bid Date: Feb 12 2025
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
