Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 28, 2025 at 8:00 PM

Updated October 29, 2025

Renovation of a clubhouse / community center in Clinton, Iowa. Completed plans call for the renovation of a clubhouse / community center.

The City of Clinton, Iowa is requesting quotes for the Shake Roof Replacement project at the Erickson Center. The City of Clinton is seeking contractors with experience in roofing to: Base Bid: Mansard Roof, Fascia & Soffit >Remove existing metal edge detail from perimeter of flat roof. >Remove existing wood shake shingles and dispose of debris. >Provide and install self-adhering high-temperature underlayment. >Provide and install 24-gauge snap-lock standing seam metal roof system. >Provide and install 24-gauge metal fascia cover and new metal soffit. >Provide and install 24-gauge metal edge detail at perimeter of flat roof. >All workmanship per mfg. specs to maintain existing flat roof warranty. Note: Replacement of any rotten wood decking, fascia or soffit is additional cost with owner'sconsent. Upon selection, substantial completion shall be by April 30 th, 2026. Question Deadline 09/30/2025 at 2:00 PM CT All questions will be directed to Josh Eggers, Parks and Rec DirectorThe City of Clinton, Iowa is requesting quotes for the Shake Roof Replacement project at the Erickson Center. The City of Clinton is seeking contractors with experience in roofing to: Base Bid: Mansard Roof, Fascia & Soffit >Remove existing metal edge detail from perimeter of flat roof. >Remove existing wood shake shingles and dispose of debris. >Provide and install self-adhering high-temperature underlayment. >Provide and install 24-gauge snap-lock standing seam metal roof system. >Provide and install 24-gauge metal fascia cover and new metal soffit. >Provide and install 24-gauge metal edge detail at perimeter of flat roof. >All workmanship per mfg. specs to maintain existing flat roof warranty. Note: Replacement of any rotten wood decking, fascia or soffit is additional cost with owner'sconsent. Upon selection, substantial completion shall be by April 30 th, 2026. Question Deadline 09/30/2025 at 2:00 PM CT All questions will be directed to Josh Eggers, Parks and Rec Director

Award

Clubhouse / Community Centers

$73,500.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
170
Active Projects
88
Bidding Soon
1,041
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 3, 2025

November 3, 2025

Project location map

1401 11th Ave N, Clinton, IA


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed