Published December 3, 2025 at 7:00 PM

Updated December 5, 2025

Site work for a water / sewer project in Spartanburg, South Carolina. Completed plans call for site work for a water / sewer project.

Reference Number 0000397878 Jones Road Drainage Improvement Project Question Deadline 09/29/2025 at 2:00 PM ET Questions are submitted online Yes , All questions shall be submitted in Horry County's online. This project involves replacing existing undersized Three (3) 36-inch reinforced concrete pipes with two (2) 6' (w) x 5' (h) box culverts with cast in place head walls beneath Jones Road, this will match the hydraulic capacity of the 10' (w) x 6' (h) box culvert approximately 800 linear feet upstream. Additionally, two (2) downstream 54" pipes will be removed and two (2) 36" reinforced concrete pipes will be replaced with dual 8' (w) x 5' (h) box culverts. The objective is to improve hydraulic conveyance and alleviate upstream flooding at Jones Road and Upstream of Highway 90. Hydraulic modeling indicates that the proposed culvert upgrade will lower the 100-year flood elevation by approximately 2.65 feet upstream of Highway 90, 3.85 feet at Jones Road, and 4.32' at the downstream existing two (2) 36" Reinforced Concrete Pipes, by achieving these reductions the 100-year flood event will be contained within the existing ditch. The anticipated start date for this work is December 1st, 2025. The project will consist of the following key improvements: o Replacing (3) 36-Inch reinforced concrete pipes with (2) 6' (w) x 5' (h) box culverts under Jones Road, including cast in place headwalls. Headwall design to be provided by contractor. o Replace (2) 36"-Inch Reinforced Concrete Pipes with (2) 8' (w) x 5' (h) box culverts under and existing downstream farm road, including rip rap outlets which will significantly increase flow capacity and improve drainage efficiency. Rip Rap with Class C an area of 320 square yard for additional stabilization north of this culvert. o Associated water and sewer relocations as required at Jones Road. All utility relocation work must be completed by a Grand Strand Water and Sewer Authority approved contractor. Additional work required but, not limited to: o Resurfacing of affected roadway sections. o Pumping and dewatering as necessary for construction o Permanent grassing for erosion control and site stabilization. o Miscellaneous landscape restoration. o Relocation of an existing water line and sewer line. o Relocation plans to be provided prior to the start of work. o Minor channel regrading Rip rap inlet and outlet stabilization. General Requirements - Bid Deposit Required - Contractors License Required - Federally Funded - Insurance Required - License Required Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Payment Bond 100 % Your firm is required to provide bid security in the amount of five percent (5%) of the base bid (excluding alternates and/or optional bid items). Electronic bid submittals must include the bidder's current (active) State of SC General Contractor's License.

GC Bidding

Water / Sewer

$623,360.00

Public - County

Site Work

10

9

23

7

Subscribe For Documents

44 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
254
Active Projects
153
Bidding Soon
1,753
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 29, 2025

January 28, 2026

Project location map

Jones Rd, Spartanburg, SC

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.