Site work and paving for a mixed-use development in Los Angeles, California. Completed plans call for site work for a water / sewer project; power facility; and sidewalk / parking lot.
Project consists of the construction of a new Los Angeles Department of Water and Power (LADWP) 34.5 kV Industrial Station, new 34.5 kV switchgear, new 18 MVA transformer equipped with Automatic Load Tap Change (ALTC) to automatically adjust the necessary transformer tap changes under load, new 11 kV AMP switchgear, 2 new 11 kV wharf AMP outlets, and a 11 kV AMP mobile cable management for cruise ships connections. In addition, this Project requires the extension of a new LADWP 34.5 kV circuit through the existing LADWP underground conduit (from 22nd Street to Berth 49 along Miner Street). Project also includes Berths 49 - 50 wharf structural AMP, landside structural AMP support, Berths 49 - 50 concrete wharf repairs, furnish and install hybrid fender backing panel including steel pipe piles and timber piles, new foam-filled fendering system, new utilities including water lines and sewer connections, customer requested civil improvements to improve pedestrian and vehicular access, safety, and security for the cruise customers and operations, and site removals. Question Deadline 11/17/2025 at 11:59 PM PT Bid Bond 10.00% Payment Bond 0.00% Performance Bond 0.00% *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Estimated Bid Value $53,800,000 - $59,500,000 The Port of Los Angeles (Port) is inviting bids for the Berths 49-51 Outer Harbor Cruise Terminal Development project. Project consists of the construction of a new Los Angeles Department of Water and Power (LADWP) 34.5 kV Industrial Station, new 34.5 kV switchgear, new 18 MVA transformer equipped with Automatic Load Tap Change (ALTC) to automatically adjust the necessary transformer tap changes under load, new 11 kV AMP switchgear, 2 new 11 kV wharf AMP outlets, and a 11 kV AMP mobile cable management for cruise ships connections. In addition, this Project requires the extension of a new LADWP 34.5 kV circuit through the existing LADWP underground conduit (from 22 nd Street to Berth 49 along Miner Street). Project also includes Berths 49 - 50 wharf structural AMP, landside structural AMP support, Berths 49 - 50 concrete wharf repairs, furnish and install hybrid fender backing panel including steel pipe piles and timber piles, new foam-filled fendering system, new utilities including water lines and sewer connections, customer requested civil improvements to improve pedestrian and vehicular access, safety, and security for the cruise customers and operations, and site removals Project requirements: SBE (Proprietary) 13%, VSBE (Harbor) 4% ( Question Deadline 10/21/2025 change from 10/20/2025 All questions must be submitted in writing at least 2 days prior to bid closing via CDBON. 6. The Contract Documents will govern in the event that the Q&A may conflict with the Contract Documents. Bidders are responsible to check CDBON for all questions and answers related to this project.
Bid Results
Water / Sewer
$61,290,400.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 20, 2025
January 19, 2026
100 Swinford St, Los Angeles, CA
Related To This Project
Los Angeles, CA
Bid Date: Oct 07 2025
Los Angeles, CA
--
Los Angeles, CA
Bid Date: May 29 2026
Los Angeles, CA
Bid Date: Sep 15 2025
Los Angeles, CA
Bid Date: Oct 01 2025
Los Angeles, CA
Bid Date: Jun 03 2021
Los Angeles, CA
Bid Date: Oct 07 2025
Los Angeles, CA
Bid Date: Oct 07 2025
Los Angeles, CA
Bid Date: Feb 19 2026
Los Angeles, CA
Bid Date: Sep 16 2025
Los Angeles, CA
Bid Date: Oct 15 2025
Los Angeles, CA
Bid Date: Sep 10 2025
Los Angeles, CA
Bid Date: Oct 02 2025
Los Angeles, CA
Bid Date: Sep 22 2025
Los Angeles, CA
Bid Date: Oct 30 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.