BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 27, 2025 at 8:00 PM

Updated October 28, 2025

Site work and paving for a bridge / tunnel in Grand Island, New York. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Construction of a bridge structure and new open channel designed to reconnect flow and aquatic habitats between the west and east branches of the Niagara River on the west end of Buckhorn Island State Park Question Deadline 09/24/2025 All Requests For Information (RFIs) are due . RFIs received after this due date and time will not be pr D006200 $62,452.90 Sixty-Two Thousand Four Hundred Fifty-Two Dollars and Ninety Cents The successful bidder will be required to furnish a Performance Bond and a Labor and Material Bond/Payment Bond in the statutory form of public bonds required by Sections 136 and 137 of the State Finance Law, each for 100% of the amount of the Contract. The following goals for MWBE participation on this project have been established at: Minority Owned Business Enterprise (MBE) 15% Women Owned Business Enterprise (WBE) 15% The following goals for SDVOB participation on this project have been established at: Service-Disabled Veteran Owned Business 4% Pursuant to Public Building Law 8(6), any contracts over $5,000 for the work of construction, reconstruction, alteration, repair, or improvement of any State building, a responsible and reliable NYS-certified Minority or Women-Owned Business Enterprise that submits a bid within ten percent of the lowest bid will be deemed the apparent low bidder provided that the bid is $1,677,139 or less (maximum amount has been adjusted for inflation effective January 1, 2025). If more than one responsible and reliable MWBE firm meets the requirements, the MWBE firm with lowest bid will be deemed the apparent low bidder. The completion date for this project is 320 days after agreement has been approved by the NYS Comptroller's Office. Cost Estimate Range: $1,061,699.30 - $1,436,416.70 ** bid date info :The Contract D number should be clearly marked in the subject line of your email, along with the words BID SUBMISSION. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Bid Results

Bridges / Tunnels

$874,479.00

Public - State/Provincial

Paving, Site Work

17

8

2

3

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
497
Active Projects
216
Bidding Soon
4,654
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 8, 2025

December 8, 2025

Project location map

E River Rd, Grand Island, NY

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.