BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 6, 2025 at 7:00 PM

Updated November 7, 2025

Site work for a water / sewer project in Reform, Alabama. Completed plans call for site work for a water / sewer project.

Separate sealed bids for the construction of: City of Reform DWSRF Waterline Upgrades Phase I Project, Contract #3 of ADEM DWSRF Project #FS010359-01 Question Deadline 10/03/2025 Every request for such interpretation should be in writing addressed to InSite Engineering, LLC and 515 Energy Center Blvd, Northport, AL 35473 to be given consideration must be received at least five (5) days prior to the date fixed for the opening of bids Work of the Project includes the installation and replacement of water distribution infrastructure to improve system reliability and service in the City of Reform, Alabama. The work under this Contract #3 of DWSRF No. FS010359-01 includes the Base Bid and two Additive Bidss, as detailed below: 1. Base Bid - 6th Street NW i. The Base Bid scope includes approximately 3,500 linear feet of 8-inch PVC SDR 21 water main and 97 linear feet of 8-inch ductile iron water main (DI CL 350), including installation of a gate valve and valve box, air release and fire hydrant assemblies, and connection to the existing 6-inch water main using a tapping sleeve, valve, and reducer. Additional work includes erosion control, seeding and mulching, and asphalt pavement patching. 2. Additive Bid #1 - 9th Avenue NW i. Additive Bid #1 involves the installation of approximately 1,386 linear feet of 4-inch PVC SDR 21 water main, including a 4-inch flush hydrant assembly, a fire hydrant assembly, an air release assembly, and eleven (11) water service connection taps. The alternate also includes connecting to an existing 6-inch water main, capping an existing 4-inch water main, erosion control, and site restoration through seeding and mulching. 3. Additive Bid #2 - 7th Avenue SW i. Additive Bid #2 includes various service line taps and connections involving both 3/4-inch and 2-inch lines. Work includes tapping existing mains, installing new service lines and water meters with vaults, relocating a water meter, capping and abandoning existing lines, and providing traffic control, erosion control, and seeding and mulching for site restoration B. All work shall be performed in accordance with the project plans, specifications, and Alabama Department of Environmental Management (ADEM) Drinking Water State Revolving Fund (DWSRF) requirements.

Award

Water / Sewer

$153,696.00

Public - City

Site Work

24

13

4

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
107
Active Projects
37
Bidding Soon
601
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 8, 2025

November 7, 2025

Project location map

Multiple Locations, Reform, AL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.