Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 2, 2026 at 7:00 PM
Updated March 3, 2026
Site work for a water / sewer project in Reform, Alabama. Completed plans call for site work for a water / sewer project.
Separate sealed bids are invited for the construction of the City of Reform DRA Waterline Upgrades (Delta Regional Authority Project No. AL-7522). All bidders must have a current State of Alabama General Contractor's License and be registered with SAM.GOV. The extent of concrete work is shown on the drawings and specified in the specifications. A. The work covered by this Section consists of furnishing all labor, equipment, and material required to place topsoil, seed, commercial fertilizer, agricultural limestone, and mulch material, including seedbed preparation, harrowing, compacting, and other placement operations on graded earthen areas as described herein and/or shown on the Drawings. In general, seeding operations shall be conducted on all newly graded earthen areas not covered by structures, pavement, or sidewalks; all cleared or grubbed areas which are to remain as finish grade surfaces. Areas disturbed by borrow activities shall also be seeded according to these Specifications. B. The work shall include temporary seeding operations to stabilize earthen surfaces during construction or inclement weather and minimize stream siltation and erosion. Temporary seeding shall be performed at the times and locations as directed by the Engineer. A. The work covered by this section includes furnishing all labor, equipment, and materials required to install and test polyvinyl chloride (PVC) pressure pipe, including valves, unions, fittings, couplings, adaptors, and accessories, as shown on the Drawings and/or specified herein. B. The Contractor's attention is called to the fact that all PVC piping and accessories are not necessarily shown completely on the Drawings which are more or less schematic. However, the Contractor shall furnish and install all piping indicated or required for proper operation of the equipment or services requiring such piping. C. Contractor's work includes collecting samples and having samples checked and approved for bacteriological analysis by the State Board of Health for water lines.
Post-Bid
Water / Sewer
$1,000,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 2, 2026
March 4, 2026
To be determined, Reform, AL
Related To This Project
Reform, AL
Bid Date: Jul 07 2020
Reform, AL
Bid Date: Oct 08 2025
Reform, AL
Bid Date: Oct 08 2025
Reform, AL
--
Reform, AL
--
Reform, AL
Bid Date: Oct 10 2024
Reform, AL
--
Reform, AL
Bid Date: Aug 28 2024
Reform, AL
Bid Date: Dec 08 2023
Reform, AL
Bid Date: Nov 03 2023
Reform, AL
Bid Date: Aug 25 2020
Reform, AL
Bid Date: Oct 05 2023
Reform, AL
Bid Date: Feb 25 2022
Reform, AL
Bid Date: Nov 17 2022
Hamilton, AL
Bid Date: Feb 10 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
