Published April 9, 2026 at 8:00 PM

Updated May 20, 2026

Site work, new construction and renovation of a water / sewer project in Reform, Alabama. Completed plans call for site work for a water / sewer project; water / sewer project; for the construction of a water / sewer project; and for the renovation of a water / sewer project.

The project includes the rehabilitation of three existing sanitary sewer lift stations within the City of Reform. Each station will be upgraded with new Vaughan pumps and electrical control panels to restore pumping efficiency and prevent overflow conditions during periods of heavy rainfall. Work includes furnishing and installing new Vaughan Model SR4V Submersible Chopper Pumps (25 HP), Vaughan Model V3P Vertical Wet Well Pumps (20 HP), base elbow assemblies, aluminum access covers, duplex control panels, enclosures, electrical service connections, and all accessories and appurtenances needed for fully operational lift stations. After equipment replacement and construction, each site will be restored, and erosion control, final seeding, and grassing will be provided. The project also includes constructing one new sanitary sewer lift station near 6th Street SE in Reform, Alabama. This new lift station will have two 30 HP Vaughan Model SR4V Submersible Chopper Pumps, a 96-inch diameter reinforced concrete wet well, and a 96-inch diameter reinforced concrete storage basin. Associated construction involves installation of about 1,634 linear feet of 8-inch PVC sanitary sewer force main and fittings, with excavation, bedding, backfill, and asphalt patching as needed. A new manhole will connect the new lift station to the existing sanitary sewer system and tie into the City's wastewater treatment plant. Additional work includes a concrete slab for the wet well and storage basin, installation of site chain link fencing and access gate, placement of #57 stone bedding and 825B stone driveway, site grading, and all required electrical and control equipment. The existing 12-inch gravity sewer line being replaced by the new system will be capped and abandoned. Clearing and grubbing will be performed at the new lift station site to remove vegetation, scrub trees, and stumps as required for site preparation. The completed project will improve pumping efficiency, reduce excessive power consumption, and mitigate the risk of sewer overflows caused by inadequate lift station capacity. The project is funded through the Alabama Department of Environmental Management's Clean Water State Revolving Fund (CWSRF) Project No. CS010849-01 as Contract #1. Question Deadline 04/03/2026 No interpretation of the meaning of the plans, specification or other pre-bid documents will be made to any bidder orally. Every request for such interpretation should be in writing addressed to at and to be given consideration must be received at least five (5) days prior to the date fixed for the opening of bids.

Bid Results

Water / Sewer

$1,057,000.00

Public - City

New Construction, Renovation, Site Work

24

17

4

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
100
Active Projects
63
Bidding Soon
677
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 8, 2026

May 8, 2026

Project location map

To be determined, Reform, AL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.