BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 12, 2025 at 8:00 PM

Updated September 13, 2025

Site work and paving for a road / highway in Sunrise Beach, Missouri. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.

The Village of Sunrise Beach requests qualifications for preliminary engineering services, subsequent engineering design services, and construction inspection services, to assist in a proposed public infrastructure project to be partially financed with Community Development Block Grant (CDBG) funds. The remainder of the project is being financed by the Village of Sunrise Beach. The project consists of pavement repair and resurfacing of an approximate 1.6 mile section of Beachwood Drive in the Village of Sunrise Beach. Information provided to the Village must include at a minimum: 1. The specialized experience and technical competence of the firm with respect to water system improvements or related work 2. The capacity and capability of the firm to perform the work in question, including specialized services, within a period of twelve months beginning November, 2025, or within a 12-month period following project award. 3. The past record of performance of the firm with respect to such factors as control of costs, quality of work, and ability to meet schedules 4. The firm's proximity to and familiarity with the area in which the project is located 5. References from previous clients of related work with the firm within the past five years 6. References and experience on projects financed by Missouri Community Development Block Grant funds. 7. Documentation of compliance with E-Verify requirements The firm will be selected based on the above qualifications. Once the most qualified firm is selected, a cost for engineering design will be negotiated separately from the cost for construction inspection. Contracting for these two activities shall occur separately and costs/payments associated with each will be clearly defined. Contracts executed for engineering design and construction inspection services shall be contingent upon the award of the grant and commitment of all project funds. For more information, Mr. Roth at 573-374-8782. The Village of Sunrise Beach is an Equal Opportunity Employer and invites the submission of proposals from minority, women, and Section 3-owned firms. The method of Contractor Selection has not been Determined at this time.

Conceptual

Roads / Highways

$525,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
94
Active Projects
61
Bidding Soon
504
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 12, 2026

Project location map

Beachwood Dr, Sunrise Beach, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.