Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in Sunrise Beach, Missouri. Completed plans call for site work for a water / sewer project.
As of October 4, 2024, an engineer and contractor have been identified. The Village of Sunrise Beach, Missouri, requests qualifications from qualified firms interested in providing professional services necessary to assist in the Villages contemplated expansion and improvement of its water and wastewater system, known as Phase IV. The Phase IV project is expected to include, though not necessarily be limited to, the following: 1. Decommissioning of existing Wastewater Treatment Plant 1 (South Plant), 2. Expansion and improvement of existing Wastewater Treatment Plant 2 (North Plant) to accept and treat all Village wastewater flows, 3. Expansion and improvement of the water and wastewater system to serve new customers at various locations within the Village corporate boundaries. The Village anticipates applying for funding through the Missouri State Revolving Fund (SRF) program, as well as other funding opportunities as may become available. The selected firm will be responsible for completing preliminary engineering reports, facility plans and other reports necessary to assist the Village in making application for SRF and other programs as may be determined. In the event the project moves into design and construction, the selected firm may be engaged for engineering design and construction inspection services, right-of-way and easement acquisition services, and other professional services as may be determined. The Village will evaluate qualifications based upon the criteria as provided for by Missouri law, as follows: 1. The specialized experience and technical competence of the firm with respect to the type of services required; 2. The capacity and capability of the firm to perform the work in question including specialized services, within the time limitations fixed for the completion of the project; 3. The past record of performance of the firm with respect to such factors as control of costs, quality of work, and ability to meet schedules; and 4. The firms proximity to and familiarity with the area in which the project is located. The firm will be selected based on the above qualifications. The relative importance of these criteria will be (A) 25%; (B) 25%; (C) 25%; and (D) 25%. The ability to meet schedules, including the Missouri 2024 SRF application deadline, will be of special importance. The Village expects to make a selection at its January 8, 2024 meeting. The Village may request interviews with a selected short list of firms during the first week of January, 2024, and / or may request interviews at another date and time. The Village reserves the right to waive any informalities or technicalities, and to negotiate directly with any respondent. Background: The Phase IV project is envisioned to be the latest phase of the Villages ongoing construction and improvement of its Water and Wastewater systems. The initial phases were completed in the 2009-11 time frame, with subsequent phases further expanding and improving the system since that time. The Village will serve approximately 450 water and sewer customers when the Phase III project (currently under construction) is completed in early 2024. Village voters previously authorized up to $8 million in bond issues to fund the system, which has been used (in part) to finance past phases, and which is expected to be available to finance (in part) the contemplated Phase IV. For more information, please contact Steve Roth, City Manager, at 573-374-8782, or by email to steve.roth@sunrisebeachmo.gov. Disadvantaged Business Enterprise (DBE) firms are encouraged to submit qualifications. The method of Contractor Selection has not been Determined at this time.
Under Construction
Water / Sewer
$8,000,000.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 29, 2024
Multiple Locations, Sunrise Beach, MO
Related To This Project
Sunrise Beach, MO
Bid Date: May 23 2024
Sunrise Beach, MO
Bid Date: Nov 15 2024
Sunrise Beach, MO
Bid Date: Feb 10 2023
Sunrise Beach, MO
Bid Date: Feb 17 2023
Saint Peters, MO
--
Springfield, MO
Bid Date: Dec 21 2023
Des Peres, MO
Bid Date: Dec 04 2023
North Kansas City, MO
Bid Date: Dec 05 2023
Chesterfield, MO
--
Mount Vernon, MO
Bid Date: Jan 04 2024
Kansas City, MO
Bid Date: Dec 12 2023
Hillsboro, MO
Bid Date: Nov 28 2023
Springfield, MO
Bid Date: Dec 14 2023
Kansas City, MO
--
Webb City, MO
Bid Date: Dec 07 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.