BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 9, 2026 at 8:00 PM

Updated March 13, 2026

Site work for a water / sewer project in Cottleville, Missouri. Completed plans call for site work for a water / sewer project.

The Successful Bidder Will Be Required to Agree That Not Less Than the State Prevailing Rate of Wages, or Davis Bacon Federal Prevailing Wage Rates, Whichever is Greater, Shall Be Paid to All Workmen, Laborers, and Mechanics Performing Their Work Under This Contract. Bids Will Be Received for a Single Prime Contract. Bids Shall Be on a Lump Sum Basis. All Bids Must Be Submitted on Forms Furnished by the Engineer The Project Consists of Upgrades to the Existing Dardenne Lift Station Including, but Not Limited to Demolition of Existing Pumps, Piping, Electrical Equipment, and Cmu Wall; Installation of New Submersible Pumps, Piping, Bypass Pump Portal, Valve Vault Grating, Electrical Equipment, Generator, Concrete Pad and Associated Civil, Sitework, Structural, and Electrical Work. Bid Security in the Amount of Ten Percent (10%) of the Bid Shall Be Furnished in Accordance With the Instructions to Bidders. Each Separate Bid Will Be Required to Remain Open for a Period of Up to Ninety (90) Days After Bids Are Opened. The Owner Reserves the Right to Reject All Bids; to Reject Any Non-responsive Bid; to Waive Informalities in the Bids; and to Determine the Low, Responsive, Responsible Bid. The Owner Reserves the Right to Award the Project in a Manner That is Deemed by the Owner to Be in the Best Interests of the Duckett Creek Sanitary District. Question Deadline 03/06/2026 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing to Adrianne Eilers, Crawford, Murphy & Tilly at aeilers@cmtengr.com. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all parties recorded as having received the Bidding Documents. Questions received less than five (5) days prior to the date for opening of Bids may not be answered. Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect.

Post-Bid

Water / Sewer

$2,000,000.00

Public - City

Site Work

27

33

2

5

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
42
Active Projects
2
Bidding Soon
1,014
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 12, 2026

May 11, 2026

Project location map

To Be Determined, Cottleville, MO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.