BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 15, 2025 at 8:00 PM

Updated September 16, 2025

Site work for a water / sewer project in Cottleville, Missouri. Working plans call for site work for a water / sewer project.

The proposed work includes the furnishing of materials, tools, equipment and labor necessary to construct Peruque Lift Station Concrete Lining in OFallon, Missouri, with Bid Number: 25-057. Work includes the construction of: Contractor shall furnish and install a lining system for the walls, ceiling, floor, and channels of wet well and screen area. Bids must be submitted on the appropriate bid forms provided and must be accompanied by a Bid Security in the amount equal to and not less than five percent (5%) of the base bid, payable without recourse to the City. The Security may be in the form of a certified cashiers check or a bidders bond in the same amount from an Incorporated Surety licensed to do business in the State of Missouri as a guarantee that the bidder will enter into a contract and execute a one hundred percent (100%) performance bond, a one hundred percent (100%) payment bond, and guaranty forms provided within ten (10) days after notice of acceptance of bid to him. Bid checks will be returned to the unsuccessful bidders when their bids are rejected. No bidder may withdraw his bid within 90 days after the bid opening. The City of OFallon, Missouri retains the right to reject any or all bids submitted. The wage rates applicable to this project have been determined as required by law and are set forth in the detailed specifications. All methods, procedures, equipment, and workmanship used for the completion of this project must be in accordance with the attached Contract Documents. All requests for clarifications on these bidding documents must be received no later than August 8, 2025 , by 5:00 PM. The enclosed Request for Information (RFI) form shall be used for all submittals. Questions may be directed to the Project Manager as follows: Catherine Politte; via email at cpolitte@ofallonmo.gov.

Final Planning

Water / Sewer

$809,000.00

Public - City

Site Work

6

5

66

4

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
202
Active Projects
112
Bidding Soon
1,282
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 20, 2025

April 1, 2026

Project location map

1572 Progress W Ln, Cottleville, MO


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.