BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 30, 2026 at 8:00 PM

Updated May 20, 2026

Renovation of an educational facility in Baltimore, Maryland. Working plans call for the renovation of a 4,000-square-foot educational facility.

Work shall include, but is not limited to the following Packing, storing, and moving any existing equipment to allow for demolition and modification of any walls as necessary. Demolition of walls, floors, the existing clean room (MEB 127), any sealed ceilings, cabinetry, etc. New penetrations and abandoning existing penetrations as required. Construction of new finishes and MEP systems. Close coordination of the Fire Alarm tie-in will need to occur with MSU's DCM and Office Safety, Hazard and Environment (OSHE) Procurement of lab equipment, including hoods. Construction of Liquid Nitrogen Tank, which will be located near the North Chilled Plant footprint. Project Site: Mitchell Engineerings Clean Room will absorb and renovate Mitchell 125, 127, 142, 144, 146, the hallway and a few support spaces. Morgan State University is selecting a Construction Management at Risk ("CMAR") firm to provide professional Estimates and Constructability Review during the design phases while providing Management and Construction Services as well as Commissioning Activities during the renovation of Mitchell Engineering to build out a clean room of approximately 4,000 GSF. Project Cost Class F - $5,000,000 to $10,000,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Question Deadline 09/30/2025 at 12:00 PM ET If you any questions, please contact Derek Underwood, Senior Procurement Specialist by email at Derek.Underwood@morgan.edu *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Construction anticipated to take 18 months.

Pre-Construction/Negotiated

Educational

$10,000,000.00

Public - State/Provincial

LEED Certification, Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

17

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 21, 2025

May 1, 2026

Project location map

Multiple Locations, Baltimore, MD

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.