Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 25, 2025 at 8:00 PM
Updated September 26, 2025
Renovation of a residential development in Baltimore, Maryland. Completed plans call for the renovation of a residential development.
Location: 946 Abbott Ct 2 Bedroom 2nd Floor General: :( ALL SUPPLIES ARE TO BE SUPPLIED BY CONTRACTOR UNLESS STATED OTHERWISE) 1.Remove and properly dispose of all trash - hazardous material, furniture and miscellaneous items in the unit. 2.Contractor is to supply dumpster or dump truck to remove bulk trash and dispose of properly 3.Supply and install all new window blinds (2-inch faux wood blinds) 4.Remove all existing appliances and range hood 5.Abate any mold observed throughout unit 6.Supply and install closet shelving/rod 7.Supply and install wood handrail with brackets 8.Clean behind all Radiators 9.Final cleaning of entire unit to make ready for occupancy including cleaning behind radiators and waxing floors upon exiting unit for turnover to maintenance dept. 10.Ensure unit is ready for Lead inspection upon completion Kitchen: ( ALL SUPPLIES ARE TO BE SUPPLIED BY CONTRACTOR UNLESS STATED OTHERWISE) 1. Supply and install Broan #4100 range hood (Black) 2. Close off existing wall fan and wire new range hood where applicable. 3. Install Range hood light bulb 4. Supply & Install severe use wood base and wall cabinets "Magnolia Cabinetry Harvard in 'Honey'" ( Or similar color) 5. Insure toe kick is installed under cabinets 6. Install Postformed Wilsonart Black Granite Laminate countertops 7. Supply and install heat shield/backsplash for stove 8. Appliances are to provided by Housing and installed by contractor. 9. Contractor will supply and install new gas supply lines on all gas appliances 10. Contractor will replace any broken gas shut off valves Bathrooms: ( ALL SUPPLIES ARE TO BE SUPPLIED BY CONTRACTOR UNLESS STATED OTHERWISE) 1. Supply and install Vanity Cabinet w/ vanity bowl and faucet (18 inch - 2 piece combo white) 2. Replace Tub 3. Supply and install ceramic tile tub wall to ceiling (Tile 12x24 color- white and grey or black marble) 4. Wrap window well and sill with same tile as wall 5. Supply and install One (1) new elongated toilet /w toilet seat (Seasons Raleigh All In One) Kitchen: ( ALL SUPPLIES ARE TO BE SUPPLIED BY CONTRACTOR UNLESS STATED OTHERWISE) 1. Supply and install Broan #4100 range hood (Black) 2. Close off existing wall fan and wire new range hood where applicable. 3. Install Range hood light bulb 4. Supply & Install severe use wood base and wall cabinets "Magnolia Cabinetry Harvard in 'Honey'" ( Or similar color) 5. Insure toe kick is installed under cabinets 6. Install Postformed Wilsonart Black Granite Laminate countertops 7. Supply and install heat shield/backsplash for stove 8. Appliances are to provided by Housing and installed by contractor. 9. Contractor will supply and install new gas supply lines on all gas appliances 10. Contractor will replace any broken gas shut off valves Bathrooms: ( ALL SUPPLIES ARE TO BE SUPPLIED BY CONTRACTOR UNLESS STATED OTHERWISE) 1. Supply and install Vanity Cabinet w/ vanity bowl and faucet (18 inch - 2 piece combo white) 2. Replace Tub 3. Supply and install ceramic tile tub wall to ceiling (Tile 12x24 color- white and grey or black marble) 4. Wrap window well and sill with same tile as wall 5. Supply and install One (1) new elongated toilet /w toilet seat (Seasons Raleigh All In One) Painting/Drywall Repair: ( ALL SUPPLIES ARE TO BE SUPPLIED BY CONTRACTOR UNLESS STATED OTHERWISE) 1. Supply all materials to Paint the Entire Units to Include: o Walls and ceilings shall be painted with two finish coats eggshell latex. o Kitchen and bathroom walls and all doors and door jams and trim shall receive a semi-gloss final finish coat color bright white. o Ceilings shall be painted in bright white ceiling paint o The Contractor shall be responsible for all drywall repairs, point-up and resulting painting required, ensuring a high-quality finish that is acceptable to the HABC Housing Management. o Paint shall be Sherwin Williams "Pro-Mar 200" in Cool platinum color walls (or brand of equal color, finish, durability, etc.). The Contractor shall follow United States Environmental Protection Agency (EPA) Lead-Based Paint Renovation, Repair and Painting (RRP) Program Rules. o Ensure that all exterior railings, awnings, and walls to unit and both adjacent units left and right have no peeling flaking or chipping paint. 2. Paint all doors, trim, and window frames with semi-gloss or DTM paint 3. Paint all radiators with DTM paint- White *If the radiator is missing a cover the contractor must manufacture one to cover the top. 4. Supply and install new six-inch wood base and quarter round shoe molding throughout entire unit & paint simi gloss white. Flooring: ( ALL SUPPLIES ARE TO BE SUPPLIED BY CONTRACTOR UNLESS STATED OTHERWISE) 1. Remove existing flooring-Supply and install Lifeproof Rigid Core Luxury Vinyl Flooring 5mm in Pelican Gray or equivalent thickness and color throughout entire unit 2. All floors must be level before applying flooring. 3. Supply and install vinyl stair treads in unit where necessary 4. All units with interior steps require step treads to be installed 5. Supply and install new six-inch wood base and quarter round shoe molding throughout entire unit & paint simi gloss white.
Bid Results
Residential Subdivision
$15,700.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 17, 2025
October 17, 2025
946 Abbott Ct, Baltimore, MD
Related To This Project
Baltimore, MD
Bid Date: Sep 15 2025
Baltimore, MD
Bid Date: Sep 17 2025
Baltimore, MD
Bid Date: Oct 03 2025
Baltimore, MD
Bid Date: Nov 21 2025
Baltimore, MD
Bid Date: Sep 24 2025
Baltimore, MD
--
Baltimore, MD
Bid Date: Oct 07 2025
Baltimore, MD
Bid Date: Sep 29 2025
Baltimore, MD
Bid Date: Sep 19 2025
Baltimore, MD
--
Baltimore, MD
--
Baltimore, MD
Bid Date: Sep 19 2025
Baltimore, MD
Bid Date: Sep 17 2025
Baltimore, MD
Bid Date: Oct 07 2025
Baltimore, MD
Bid Date: Sep 29 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
