BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 15, 2025 at 8:00 PM

Updated October 3, 2025

Site work for a power facility in Greeley, Nebraska. Completed plans call for site work for a power facility.

The Project will consist of furnishing material, labor, and equipment for the construc tion of approximately 6.5 miles of 12.5kV distribution line, This also includes the removal of epproximately 6.5 miles of 7.2 KV distribution line. Construc-tion is to commence on or be fore February 16, 2026 and 10 be complete by May 15, 2026. Each proposal must be ac-companied by a &d Bond in form attached or a certified check of a bank that is a ment-ber of the Federal Deposit In surance Corporation, payable to the order of the Owner, in an amount equal to ten per cent (10%) of the maximum bid price. Performance Bond: Required from the successful bidder

Post-Bid

Power Plant

$430,000.00

Public - County

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
26
Active Projects
14
Bidding Soon
215
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 2, 2025

February 16, 2026

Project location map

To Be Determined, Greeley, NE

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.