BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 20, 2025 at 8:00 PM

Updated October 21, 2025

New construction of a water / sewer project in Conroe, Texas. Completed plans call for the construction of a water / sewer project.

Scope The work consists of providing the necessary labor, material, equipment, and supervision to construct Two Step Farm Phase II Wastewater Treatment Plant for Montgomery County Municipal Utility District No. 123. Question Deadline 10/04/2025 at 11:00 AM CT In ample time to permit consideration before reply, submit questions about bidding instruments to the Engineer Questions will not be considered or answered after 10:00 a.m., three (3) calendar days prior to bidding The site work contractor is responsible for all site work, including but not limited to expansion of the capacity of the existing lift station including bypass pumping, demolition and replacement of three (3) submersible pumps with all accessories, riser piping, valves, coatings and supports; yard piping; manhole; site work; protective coatings, concrete pads; a steel elevated headworks structure with manual bar screen and flow-splitting weirs, underground piping at Train Nos. 1, 2 & 3; 480V distribution panelboard; 120/240V panelboard; lighting contactor panel; SPD; site lighting; electrical rack and supports; electrical manholes; underground duct banks with wires and conduits; terminal boxes at Aeration Basin; wires and conduits from the terminal boxes at Aeration Basin to the electrical rack; lift station control panel; grounding; bollards; site grading; all associated electrical and site work; facility start-up in its entirety; and all else specified and shown in the construction documents, complete in place for a fully functioning plant. The purchase of the 250,000 gallon per day interim package wastewater treatment plant facilities shall include delivery and assembly of the facilities with all accessories and equipment; including aeration basins; multi-stage digester units; final clarifier; chlorine contact basin; non-potable water system; sodium hypochlorite disinfection equipment and disinfection equipment building; eyewash and safety shower with canopy; walkways, bridges, and handrails; air diffusion equipment; air lifts; flow measurement equipment and PLC control panel; blowers; aboveground interconnecting piping, valves, fittings, supports; hose bibbs; control panels for equipment including the blowers, clarifier, non-potable water system, disinfection equipment and effluent flow measurement; basin lightings, and all other electrical plant devices; and electrical wiring (including wiring to the terminal boxes at Aeration Basin No. 1); and all accessories, equipment, piping, etc. within the plant, complete as specified. Within the package plant scope is all the plant related functions from the stub up for the force main piping upstream of Aeration Basin No 3 and the stub up for the effluent piping downstream of the chlorine contact basin; and everything in between. The installation of the package plant facilities shall be the responsibility of the package plant vendor. Installation includes all delivery, installation and start-up. The site work contractor shall coordinate with the package plant vendor for all connections and slab dimensions. At the package facilities, the site work contractor is responsible for all site work shown in the construction drawings including all work not associated with the package facilities. However, the site work contractor is responsible for concrete slabs and pads, and all buried piping located within the limits of the proposed package facilities. All buried piping shall be installed with a flanged stub-up approximately 12-inches (12") above finished grade at all locations. The site work contractor is responsible for any underground duct banks and underground conduit between local control panels supplied by the package plant vendor and field equipment supplied by the package plant vendor unless stated otherwise on the plans. The package plant vendor is responsible for all wiring between the local control panels supplied by the package plant vendor and field equipment supplied by the package plant vendor and for all above ground conduit between the local control panels and field equipment unless stated otherwise on the plans. The site work contractor is responsible for coordination with package plant firm to coordinate pipe and electrical connections, buried pipe locations, deliveries and schedules.

Bid Results

Water / Sewer

$4,023,026.00

Public - County

New Construction

58

27

12

6

Subscribe For Documents

60 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 16, 2025

December 15, 2025

Project location map

To Be Determined, Conroe, TX

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.