BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 14, 2025 at 8:00 PM

Updated October 15, 2025

Site work and new construction of a civil project in Paradise, California. Conceptual plans call for the construction of a water / sewer project; and for site work for a water / sewer project.

The Town of Paradise (Town or Town of Paradise) requests qualifications from experienced consultants . The Town of Paradise seeks to engage a qualified engineering design team to deliver professional services for the planning, design, and permitting of a new wastewater treatment facility (WWTF). The selected facility will utilize aerated lagoon treatment with land application discharge through percolation and evaporation ponds. This work is a critical component of the Paradise Sewer Project to restore community infrastructure following the 2018 Camp Fire and provide a fundable, permittable, and scalable wastewater solution. The selected Proposer will become the Consultant and will work collaboratively with Town staff, the Town's Owner's Agent (HDR), and the Sewer Project Ad Hoc Committee to advance the project from 5% to 100% design and support the required environmental review process and regulatory approvals. To design a Wastewater Treatment Facility that meets the design criteria listed below: a) Aerated lagoon(s) secondary treatment b) Average dry weather flow (ADWF) between 40,000 gallons per day (gpd) and 100,000 gpd c) Peak wet weather flow (PWWF) between 100,000 gpd and 300,000 gpd d) Influent wastewater characteristics of approximately 60-75% typical domestic wastewater and 25--40% septic tank effluent e) Percolation/evaporation pond(s) for treated effluent discharge f) Compliance with the requirements of State Water Resources Control Board Order WQ 2014-0153-DWQ General Waste Discharge Requirements for Small Domestic Wastewater Treatment Systems, with a high threat total nitrogen effluent limit g) Planning level design for phased future expansions or upgrades to treat up to up to 1.0 million gallons per day (MGD) ADWF. Future expansions or upgrades may utilize different treatment methods. I am a Consultant (SNH Engineering, LLC / MBE) specializing in Electrical/Controls Design for WWTP/WTP and Pump Stations. I wish to include my firm with Bidders as Subconsultant. Sep 11, 2025 12:59:30 PM EDT Please follow the included instructions to submit an Statement of Qualifications. Sep 12, 2025 12:21:43 PM EDT The method of Contractor Selection has not been Determined at this time.

Conceptual

Water / Sewer

$700,000.00

Public - City

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

11

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
18
Active Projects
1
Bidding Soon
263
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 27, 2026

Project location map

To Be Determined, Paradise, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.