BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 4, 2025 at 7:00 PM

Updated November 5, 2025

Site work and paving for a sidewalk / parking lot in Orange City, Florida. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

** ASs of 11/04/2025 project has been awarded to DDS Enterprises LLC with an awarded amount of $227,423.24.** Construct a new gravel parking lot located at 440 S. Holly Avenue, Orange City, FL 32763, utilizing a True Grid containment system or an approved equivalent. Contractors proposing an equivalent containment system must submit for review and approval by the City prior to bid submittal. The construction involves driveway construction, grading, tree removal, tree protection, flat concrete and curb installation, installation of True Grid containment system or an approved equivalent, installation of 3/4 " gravel (FDOT #57 stone), and ADA signage and pavement marking. Bid Bond 5% The City of Orange City is accepting sealed bids from qualified Contractors to construct a new gravel parking lot located at 440 S. Holly Avenue, Orange City, FL 32763, utilizing a True Grid containment system or an approved equivalent. Contractors proposing an approved equivalent must submit for review and approval by the City prior to bid submittal. The construction involves driveway construction, grading, tree removal, tree protection, flat concrete and curb installation, installation of True Grid containment system or an approved equivalent, installation of 3/4" gravel (FDOT #57 stone), and ADA signage and pavement marking. The City will include a base bid form that will incorporate all necessary items to complete the project in accordance with Attachment A - Drawings for South Holly Avenue Gravel Parking Lot Additionally, an alternate bid form is included that incorporates all necessary items to complete a larger scale gravel parking lot in accordance with Attachment B - Drawings for South Holly Avenue Gravel Parking Lot. This project shall reach substantial completion within ninety-one (91) calendar days upon issuance of a written Notice to Proceed unless otherwise modified by the City. The City will impose liquidated damages at $500.00 per day until substantial completion is met. Question Deadline 10/02/2025 at 5:00 PM ET Last Day for Questions: All questions or concerns regarding this ITB must be submitted in writing, to Michael Hall, Senior Procurement Analyst Questions should be emailed to mhall@orangecityfl.gov referencing the ITB number in the subject line

Award

Sidewalks / Parking Lot

$202,511.00

Public - City

Paving, Site Work

28

10

7

6

Subscribe For Documents

48 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
72
Active Projects
6
Bidding Soon
1,301
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 16, 2025

December 1, 2025

Project location map

440 S Holly Ave, Orange City, FL


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.