BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 28, 2025 at 8:00 PM

Updated October 29, 2025

Site work for a water / sewer project in Abilene, Texas. Completed plans call for site work for a water / sewer project.

Replacement of approximately 24,500 linear feet of 14" through 2" waterline in the Owner's existing distribution system. BID BOND: 5% PERFORMANCE/PAYMENT BONDS: 100% FUNDING AGENCY: Local / TxDOT Questions will be automatically directed to and reviewed by the project manager : Luke Van Diest, P.E. / lvandiest@jacobmartin.com The products listed in contractor signed letter (sample in Appendix B of the bid set), provided by contractor, are fabricated from steel or iron that is melted and manufactured, and any coating applied, in the United States and meet the requirements of Buy America 23 CFR 635.410. The Steamboat Mountain WSC reserves the right to reject any or all bids or to waive any informalities in the bidding. Bids may be held by Steamboat Mountain WSC for a period not to exceed 60 days from the date of the bid opening for the purpose of reviewing the bids and investigating the bidder's qualifications prior to the contract award. The Steamboat Mountain WSC is an Equal Opportunity Employer. Prebid: No Prebid WORK INCLUDED A. Construct work as described in the Contract Documents. 1. Provide materials, equipment, and incidentals required to make the project completely operable. 2. Provide the labor, equipment, tools, and consumable supplies required for a complete project. 3. Provide the civil, architectural, structural, mechanical, electrical, instrumentation and all other work required for a complete and operable project. 4. Test and place the completed project in operation. 5. Provide the special tools, spare parts, lubricants, supplies, or other materials as required for the operation and maintenance of the Project. 6. Drawings and Specifications may not indicate or describe all of the work required to complete the project. +Additional details required for the completion of the project are to be provide by the CONTRACTOR and coordinated with the ENGINEER. Completion- 240 consecutive calendar days

Award

Water / Sewer

$3,098,282.00

Public - City

Site Work

57

14

4

4

Subscribe For Documents

51 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
33
Active Projects
13
Bidding Soon
198
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 14, 2025

December 15, 2025

Project location map

US-84 & US-83, Abilene, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.