Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 28, 2025 at 8:00 PM
Updated October 29, 2025
Site work for a water / sewer project in Abilene, Texas. Completed plans call for site work for a water / sewer project.
Replacement of approximately 24,500 linear feet of 14" through 2" waterline in the Owner's existing distribution system. BID BOND: 5% PERFORMANCE/PAYMENT BONDS: 100% FUNDING AGENCY: Local / TxDOT Questions will be automatically directed to and reviewed by the project manager : Luke Van Diest, P.E. / lvandiest@jacobmartin.com The products listed in contractor signed letter (sample in Appendix B of the bid set), provided by contractor, are fabricated from steel or iron that is melted and manufactured, and any coating applied, in the United States and meet the requirements of Buy America 23 CFR 635.410. The Steamboat Mountain WSC reserves the right to reject any or all bids or to waive any informalities in the bidding. Bids may be held by Steamboat Mountain WSC for a period not to exceed 60 days from the date of the bid opening for the purpose of reviewing the bids and investigating the bidder's qualifications prior to the contract award. The Steamboat Mountain WSC is an Equal Opportunity Employer. Prebid: No Prebid WORK INCLUDED A. Construct work as described in the Contract Documents. 1. Provide materials, equipment, and incidentals required to make the project completely operable. 2. Provide the labor, equipment, tools, and consumable supplies required for a complete project. 3. Provide the civil, architectural, structural, mechanical, electrical, instrumentation and all other work required for a complete and operable project. 4. Test and place the completed project in operation. 5. Provide the special tools, spare parts, lubricants, supplies, or other materials as required for the operation and maintenance of the Project. 6. Drawings and Specifications may not indicate or describe all of the work required to complete the project. +Additional details required for the completion of the project are to be provide by the CONTRACTOR and coordinated with the ENGINEER. Completion- 240 consecutive calendar days
Award
Water / Sewer
$3,098,282.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 14, 2025
December 15, 2025
US-84 & US-83, Abilene, TX
Related To This Project
Abilene, TX
Bid Date: Dec 04 2025
Abilene, TX
--
Abilene, TX
Bid Date: Oct 20 2025
Abilene, TX
Bid Date: Oct 07 2025
Abilene, TX
--
Abilene, TX
--
Abilene, TX
--
Abilene, TX
Bid Date: Sep 24 2025
Abilene, TX
Bid Date: Jan 27 2026
Abilene, TX
Bid Date: Oct 08 2025
Abilene, TX
--
Abilene, TX
Bid Date: Oct 09 2025
Abilene, TX
Bid Date: Sep 02 2025
Abilene, TX
Bid Date: Sep 09 2025
Unlock Your Potential with Access to Commercial Construction Data
Sign up now to get free company and project data. No payment required.
