Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 28, 2025 at 8:00 PM
Updated October 29, 2025
Renovation of a multi-residential development in Montreal, Quebec. Working plans call for the renovation of a six-story above grade, 79-unit multi-residential development.
Bid is cancelled "As per the owner the project has been cancelled. team is actively seeking updated information." Reference number: 20094296 Deadline for receipt of complaints 2025-09-29 Electronic tender submission accepted Yes, via SEAO, with a document Expected duration of the contract without options (in months) 8 Description 1. PURPOSE OF THE CONTRACT 1.1 The OMHM is issuing a public call for tenders for the installation of a fire pump at the Madeleine-d'Ailleboust residences located at 3980 Dandurand Street in the Rosemont-La Petite-Patrie borough of Montreal. 1.2 The project consists of carrying out all work in accordance with the contract documents. Without limitation, the scope of work mainly includes replacing the fire pump (including its electrical connection) with a new water inlet, modifying the fire protection valve, selectively dismantling pipes and reconnecting them according to a new configuration. An automatic fire alarm system will be added and a new pump room will be built. Replacement of reinforced taps will be carried out on a few floors. Installation and commissioning of a fire alarm system. This work also includes the installation of an underground pipe and connection to the city network. Electrical and signal connections to the alarm panel will be required. 1.3 The work will be carried out in a six-story tower block comprising 79 flats for families, couples and single people. 1.4 The flats will remain occupied during the work. 2. DURATION OF THE WORK 2.1 According to the current schedule, work is expected to begin as soon as the letter of commitment is signed, but this date may be changed by the OMHM. In such a case, the change cannot be used to justify a request for additional compensation by the successful bidder. The works must be completed within a maximum of 220 working days from the date confirmed in the letter of commitment as the start date for the works.
Final Planning
Multi-Residential
$162,000.00
Public - City
Renovation
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 14, 2025
April 28, 2026
3980 Rue Dandurand, Montreal, QC
Related To This Project
Montreal, QC
Bid Date: Nov 27 2025
Montreal, QC
Bid Date: Oct 02 2025
Montreal, QC
Bid Date: Oct 21 2025
Montreal, QC
Bid Date: Oct 31 2025
Montreal, QC
Bid Date: Oct 21 2025
Montreal, QC
Bid Date: Oct 29 2025
Montreal, QC
--
Replacement of the LED Display System at the Claude-Robillard Sports Complex Swimming Pool - 5915115
Montreal, QC
Bid Date: Nov 25 2025
Montreal, QC
Bid Date: Nov 12 2025
Montreal, QC
Bid Date: Oct 29 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
