Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 14, 2025 at 7:00 PM
Updated November 15, 2025
Site work for a civil project in Village of Golf, Florida. Completed plans call for site work for a water / sewer project.
**As of November 14, 2025, this project has not yet been awarded. A timeline for the award has not yet been established.** The Village of Golf (Village) is accepting bids from qualified and responsible contractors to furnish and assume full responsibility for all labor, material, construction equipment and machinery, transportation, tools, appliances, fuel, power, light, telephone, water, sanitary facilities, temporary facilities and all other facilities and incidentals necessary, including supervision, servicing, taxes, bonds and insurance, permitting fees, traffic control, security, miscellaneous costs, warranties, general conditions, overhead and profit to perform the work of pump station and manhole rehabilitation located within the Village. PROJECT LOCATION The project is located in Township 45 South, Range 42 East, in Section 36 in Palm Beach County, Florida. The project consists of rehabilitation of four (4) wastewater pump stations (PS) including PS No. 3 in the Village of Golf, PS No. 3 and 4 in Quail ridge and PS Indian Springs as well has rehabilitation of 31 wastewater manholes . Any and all questions regarding the bid documents shall be directed to the Village Clerk, 21 Country Road, Village of Golf, FL 33436 or via email to: dlynn@villageofgolf.org. No Bid may be withdrawn for a period of 180 days after the scheduled closing date for the receipt of bids except as otherwise provided in Section 5 - Instructions to Bidders, in the Invitation to Bid document. The estimated cost is around $265,000.00. **In accordance with the Americans with Disabilities Act, any person who believes he or she has a disability requiring the use of a special accommodation at either the scheduled site inspections, pre-bid conference or bid opening should contact the Village Clerk at 561-732-0236.** The Work to be completed shall generally include, but not be limited to, the following: 1. The Contractor is responsible for visiting the project site and familiarizing himself with the existing project conditions and project requirements prior to submitting theirbid. The Contractor should contact the Village Clerk to arrange for a site visit. 2. The Contractor is responsible to document the existing site conditions via taking photographs and video before and after construction. 3. The work shall cause minimal disruption and be performed in an expedited, highly coordinated manner by the Contractor. 4. The Contractor shall be solely responsible for all construction sequencing. 5. Execute the Work in accordance with the latest applicable Village requirements and ordinances (noise, construction hours, dust control, etc.) 6. Maintenance of traffic in accordance with Village requirements, restoration in accordance with the Village standards, coordination with property owners as required, and any other items depicted on the drawings and described in these documents and referenced materials. 7. Prior to construction, the Contractor shall be responsible for determining the location, depth, and connectivity of all existing utilities, whether shown on the Construction Drawings or not. Contractor shall protect and support all existing utilities. 8. Attend Village Council meetings and/or workshops to discuss project construction progress as required. 9. Obtain all required necessary permits required to execute the Work. 10. The Contractor shall furnish all materials, equipment and labor which is reasonably and properly inferable and necessary for the proper completion of the Work, whether specifically indicated in the Contract Documents or not. Final Completion: 210) calendar days WBE (6.9%) Question Deadline 10/03/2025 Any and all inquiries regarding this ITB or the project must be directed in writing, by US mail or email to: Village of Golf Village Clerk 21 Country Road Village of Golf, FL 33436 E-mail: dlynn@villageofgolf.org All questions or inquiries must be received no later than ten (10) calendar days prior to the Bid Submittal Deadline. Completion of Project construction is scheduled for March 15, 2027.
Bid Results
Water / Sewer
$473,060.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 14, 2025
November 13, 2025
To Be Determined, Village of Golf, FL
Related To This Project
Village of Golf, FL
--
Village of Golf, FL
Bid Date: Aug 10 2021
Village of Golf, FL
Bid Date: May 07 2020
Village of Golf, FL
Bid Date: Oct 22 2021
Village of Golf, FL
Bid Date: Jun 21 2022
Naples, FL
Bid Date: Oct 24 2025
North Lauderdale, FL
Bid Date: Oct 09 2025
Bonita Springs, FL
Bid Date: Oct 28 2025
Tampa, FL
Bid Date: Oct 08 2025
Seffner, FL
Bid Date: Oct 08 2025
Orange Park, FL
Bid Date: Oct 06 2025
Fort Pierce, FL
Bid Date: Oct 14 2025
Cape Coral, FL
Bid Date: Sep 17 2025
Kissimmee, FL
Bid Date: Oct 15 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
