Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 21, 2025 at 7:00 PM
Updated November 22, 2025
Site work for a civil project in Boynton Beach, Florida. Completed plans call for site work for a water / sewer project.
The Village of Golf (Village) is accepting bids from qualified and responsible contractors to furnish and assume full responsibility for all labor, material, construction equipment and machinery, transportation, tools, appliances, fuel, power, light, telephone, water, sanitary facilities, temporary facilities and all other facilities and incidentals necessary, including supervision, servicing, taxes, bonds and insurance, permitting fees, traffic control, security, miscellaneous costs, warranties, general conditions, overhead and profit to perform the work of water treatment plant improvements located within the Village. Funds for this project are anticipated to be derived from the State Revolving Fund (SRF) loan. Therefore, the successful Contractor must comply with all applicable state and federal guidelines Any and all questions regarding the bid documents shall be directed to the Village Clerk, 21 Country Road, Village of Golf, FL 33436 or via email to: dlynn@villageofgolf.org. Question Deadline 10/03/2025 No Bid may be withdrawn for a period of 180 days after the scheduled closing date for the receipt of bids except as otherwise provided in Section 5 - Instructions to Bidders, in the Invitation to Bid document. Project Description: The following Project description is for general information only and should not be construed to be a complete description of all Work required. References should be made to the construction drawings and technical specifications, along with General Conditions. The Village is located in Palm Beach County, Florida. The Village has undertaken a project to improve various aspects of the existing water treatment plant. The Contractor should read the entire document and all associated attachments to ensure all requirements are understood prior to bidding. The Contractor is responsible for familiarizing itself with existing field conditions and is encouraged to visit the project location. Contractor to furnish all labor and materials necessary to construct the improvements as described in the construction drawings and specifications prepared by MockoRoos, The Work to be completed shall generally include, but not be limited to, the following: 1. The Contractor is responsible for visiting the project site and familiarizing himself with the existing project conditions and project requirements prior to submitting theirbid. The Contractor should contact the Village Clerk to arrange for a site visit. 2. The Contractor is responsible to document the existing site conditions via taking photographs and video before and after construction. 3. The work shall cause minimal disruption and be performed in an expedited, highly coordinated manner by the Contractor. 4. The Contractor shall be solely responsible for all construction sequencing. 5. Execute the Work in accordance with the latest applicable Village requirements and ordinances (noise, construction hours, dust control, etc.) 6. Maintenance of traffic in accordance with Village requirements, restoration in accordance with the Village standards, coordination with property owners as required, and any other items depicted on the drawings and described in these documents and referenced materials. 7. Prior to construction, the Contractor shall be responsible for determining the location, depth, and connectivity of all existing utilities, whether shown on the Construction Drawings or not. Contractor shall protect and support all existing utilities. 8. Attend Village Council meetings and/or workshops to discuss project construction progress as requiredObtain all required necessary permits required to execute the Work. 10. The Contractor shall furnish all materials, equipment and labor which is reasonably and properly inferable and necessary for the proper completion of the Work, whether specifically indicated in the Contract Documents or not. ROJECT LOCATION A. The project is located in Township 45 South, Range 42 East, in Section 36 in Palm Beach County, Florida. The project consists of improvements to the Village's water treatment plant including interior piping, valves, flow meters, generator replacement, electrical upgrades, and expansion of instrumentation and control capabilities of the membrane trains. The approximate location of the improvements is the following coordinates (26.509253, - 80.118589). 2.0 SCOPE OF WORK B. The Work to be performed by the Contractor includes submitting and obtaining a building department permit, other permitting, inspecting, furnishing all materials, labor, tools, equipment, water, light, power, transportation, superintendence, temporary construction of every nature, and all other services and facilities of every nature whatsoever necessary to modify, construct, complete, deliver and place in operation the subject Project as shown on the Drawings and/or as herein described as specified. All Work to be in accordance with the Contract Documents and the Contract Agreement between the Village of Golf and the awarded bidder from now on referred to as the "Agreement".
Award
Water / Sewer
$1,136,500.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 14, 2025
November 13, 2025
Golf Rd, Boynton Beach, FL
Related To This Project
Boynton Beach, FL
Bid Date: Jul 19 2019
Boynton Beach, FL
Bid Date: Nov 10 2025
Boynton Beach, FL
Bid Date: Nov 04 2025
Boynton Beach, FL
Bid Date: Dec 15 2025
Boynton Beach, FL
--
Boynton Beach, FL
Bid Date: Dec 02 2025
Boynton Beach, FL
Bid Date: Jan 05 2026
Boynton Beach, FL
Bid Date: Sep 25 2025
Boynton Beach, FL
Bid Date: Oct 17 2025
Boynton Beach, FL
Bid Date: Oct 24 2025
Boynton Beach, FL
Bid Date: Sep 26 2025
Boynton Beach, FL
Bid Date: Sep 05 2025
Boynton Beach, FL
Bid Date: Aug 19 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
