Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 12, 2026 at 7:00 PM
Updated January 13, 2026
Demolition, site work, paving, new construction and addition to a mixed-use development in Boynton Beach, Florida. Working plans call for the addition of a parking garage; for the demolition of a parking garage; for the construction of a 28,750-square-foot, 13-acre parking garage; for site work for a parking garage; sidewalk / parking lot; for paving for a sidewalk / parking lot; and 22,500-square-foot office development.
Reference Number 0000404125 The Construction Manager at Risk (CMAR) shall provide all Pre-Construction Phase Services necessary to establish a Guaranteed Maximum Price (GMP) and all Construction Phase Services following the award of the GMP for the facility identified in this Project Notification. During the Architectural and Engineering Design Phase, the CMAR shall advise the A/E team on cost considerations and building system selections, providing recommendations for cost savings and schedule acceleration opportunities. These recommendations shall be presented to the A/E and the District for review and approval. The CMAR shall conduct document reviews and prepare detailed construction cost estimates at the completion of the Schematic Design Phase, Design Development Phase, and at approximately seventy-five percent completion of the Construction Documents. Schedule updates shall be provided throughout the design phases to ensure alignment with proposed construction milestones. Early procurement planning may be required for demolition, mechanical, electrical, or other critical systems, which could result in an early GMP for procurement only. The CMAR shall also perform other pre-design services as requested by the Owner. The construction management services will include new site development and construction of a +-13-acre campus that will house a +-28,750-square-foot transportation operations facility for school bus fleet maintenance, supported by a surface parking lot for approximately 224 buses. The project will also include a +-22,500-square-foot administrative headquarters facility containing offices, dispatch, meeting, and training rooms, along with other support spaces and a surface parking lot for staff and drivers. Additional facilities will consist of a +-10,000-square-foot fueling island and bus wash facility, as well as bus washing amenities and charging stations for electric buses. The scope may also include demolition or renovation of existing structures as required to accommodate the new design. The construction schedule may be phased as determined by the Owner, with input from the A/E and CMAR teams. Construction shall incorporate all of the requirements set forth in the Permitted Construction Documents, School District of Palm Beach County Master Specifications, District Design Criteria, State Requirements for Educational Facilities (SREF) 2014, Florida Administrative Code (FAC) Chapter 6A-2 and Florida Building Code. The CONSTRUCTION MANAGER shall prepare all Project Documents in accordance with the requirements stated in Department of Education's Chapter 6A-2, SREF and FAC. Design Notice to Proceed february 23, 2026 Substantial Completion august 31, 2028 Final Completion november 30, 2028 Question Deadline 12/01/2025 at 2:00 PM ET Questions are submitted online Yes, All questions regarding this solicitation must be submitted via online. Only questions received via online by the time and date specified will be answered by Addendum and posted on online. Shortlist Confirmed
Final Planning
Parking Garage
Public - County
Addition, Demolition, New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 15, 2025
February 23, 2026
1300 SW 30th Ave, Boynton Beach, FL
Related To This Project
Boynton Beach, FL
--
Boynton Beach, FL
Bid Date: Dec 02 2025
Boynton Beach, FL
Bid Date: Jan 20 2026
Boynton Beach, FL
--
Boynton Beach, FL
--
Boynton Beach, FL
Bid Date: Jan 09 2026
Boynton Beach, FL
Bid Date: Feb 16 2026
Boynton Beach, FL
Bid Date: Nov 04 2025
Boynton Beach, FL
Bid Date: Nov 10 2025
Boynton Beach, FL
Bid Date: Jul 19 2019
Boynton Beach, FL
Bid Date: Oct 14 2025
Boynton Beach, FL
Bid Date: Sep 25 2025
Boynton Beach, FL
Bid Date: Oct 17 2025
Boynton Beach, FL
Bid Date: Oct 24 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
