BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 13, 2026 at 8:00 PM

Updated March 14, 2026

Site work for a water / sewer project in Boynton Beach, Florida. Completed plans call for site work for a water / sewer project.

**As of March 13, 2026, this project has not yet been awarded. A timeline for the award has not yet been established.** The City of Boynton Beach Utilities Department is requesting sealed bids from qualified contractors for utility improvement work at three independent locations within the City. The project consists of two main utility extensions across these three sites: Location 1 within the residential community of High Point Woods Villa; Location 2 along Seacrest Boulevard near Bethesda Memorial Hospital; and Location 3 at the intersection of SW 27th Avenue and SW 4th Street. The Contractor shall furnish all labor, tools, equipment, materials, supplies, manufactured articles, furnishing all transportation and services, and essential communications, etc., as necessary to complete the project, as indicated in the Special Conditions, Special Provisions, Project Design Plans, Technical Specifications and ITB No. 26-009B Documents herein, along with all engineering, shop drawings, and other documentation necessary to obtain all applicable permits and all bonds, securities, licenses and insurance to complete the project as specified herein and within the Project Design Plans. All proposed improvements shall be completed in accordance with the project bid documents, design plans, details, technical specifications/scope of work, and all applicable federal, state, county, and local regulatory requirements. Question Deadline 01/10/2026 at 3:00 PM ET All question submitted by online Pursuant to Florida Statutes 119.07, sealed Bids, Proposal or Responses received by the City in response to a Request for Qualification or Invitation to Bid are exempt from public records disclosure requirements until thirty (30) days after the opening of the Proposals/Bids unless the City announces intent to award sooner. If the City rejects all Responses submitted in accordance with a Request for Proposal/Qualification or Invitation to Bid, and the City concurrently provides notice of its intent to reissue the competitive solicitation, the rejected Responses remain exempt from public disclosure until such time as the City provides notice of a decision or intended decision concerning the competitive solicitation or until the City withdraws the reissued competitive solicitation. A Bid, Proposal, Response, or reply is not exempt for longer than twelve (12) months after the initial City notice rejecting all Bids, Proposals, or replies. The City reserves the right to award to more than one Bidder. The Bidder(s) shall act as an independent contractor and not as an employee of the City

Bid Results

Water / Sewer

$1,056,349.00

Public - City

Site Work

24

12

23

9

Subscribe For Documents

37 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
234
Active Projects
80
Bidding Soon
1,505
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 20, 2026

March 23, 2026

Project location map

Multiple Locations, Boynton Beach, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.