Published November 11, 2025 at 7:00 PM
Updated November 12, 2025
Site work for a water / sewer project in Franklin, Louisiana. Completed plans call for site work for a water / sewer project.
Water Sector Program - Phase III, Waterline Interconnect Between the Glencoe and Four Corners Distribution Systems Project The St. Mary Parish Water & Sewer Commission No. 5, acting through its President, Lionel Metz, will receive sealed bids for the Water Sector Program - St. Mary Parish Water & Sewer Commission No. 5 - Phase III, Waterline Interconnect Between the Glencoe and Four Corners Distribution Systems project, which consists of furnishing and installing approximately 8,849 linear feet of 10" PVC waterline pipe, Mobilization and demobilization, aggregate surfacing, trenchless utility installation, 10" PVC water main, 10" Fusible PVC water main, ductile iron fittings, water main joint restraints, fire hydrant assemblies, tapping sleeves and valves, etc. -- The work under this Contract shall consist of the furnishing of all materials, tools, water, electricity, superintendence, labor and incidentals required for the construction and completion of 10" water mains and all other related work as shown on the Plans and hereinafter specified Location The work is located along LA Hwy 318 and LA Hwy 83 near Glencoe, St. Mary Parish, Louisiana. Any person with disabilities requiring special accommodations must contact the St. Mary Parish Government no later than seven (7) days prior to the bid opening, /s/ Lionel Metz Lionel Metz, President St. Mary Parish Water & Sewer Commission No. 5 Specifications and other pertinent documents) may be examined at the following locations: -Miller Engineers & Associates, Inc. - 601 Main Street; Franklin, Louisiana 70538 Completion- 150 working days Q/A - Oct. 3, 2025 - All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda mailed or delivered to all parties recorded by Engineer as having received the Bidding Documents. Questions received less than five days prior to the date for opening of Bids may not be answered. Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. Bid(5%), Performance(100%), Payment(100%), Certified Check
Award
Water / Sewer
$766,636.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.