Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 25, 2025 at 8:00 PM
Updated November 14, 2025
Site work and new construction of a mixed-use development in Rocklin, California. Completed plans call for the construction of a 66,000-square-foot, two-story above grade educational facility; and for site work for a educational facility.
The project consists of a new two story 66,000 GSF cast-in-place concrete building containing classroom, lecture, laboratory, library, instructional support, and exhibit spaces. In addition, the project will also remove several temporary buildings. Location- 5100 Sierra College Blvd. Rocklin, CA 95677 DSA Application No: 02-120694 PART 2 The Project provides a new state of the art Science Building for Sierra College at the Rocklin campus. The project consists of a new two story 66,000 GSF cast-in-place concrete building containing classroom, lecture, laboratory, library, instructional support, and exhibit spaces. In addition, the project will also remove several temporary buildings. Funding for the Project is from a combination of State, Measure E, and local District funding. Funding for the Project is from a combination of State funding and local District funding and is based on the Board of Trustees approved 2018 Campus Facility Master Plan. The construction budget for the Project is $62,600,000. This amount includes all costs including planning, construction, supervision, management, compliance with all applicable codes and agency requirements, and any and all items required for the completion of the Project per the Contract Documents. The construction budget for the Project is $62,600,000 Completion-(700) consecutive calendar days. Questions Due Date: Sep 30th 2025, 5:00 PM PDT All questions about the meaning or intent of the Contract Documents are to be submitted via the District's online vendor portal . Questions received less than SEVEN (7) calendar days prior to the date for opening Bids may not be answered.
Award
Educational
$62,226,600.00
Public - County
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 21, 2025
December 22, 2025
5100 Sierra College Blvd, Rocklin, CA
Related To This Project
Rocklin, CA
--
Rocklin, CA
--
Rocklin, CA
Bid Date: Oct 23 2025
Rocklin, CA
--
Rocklin, CA
Bid Date: Nov 17 2025
Rocklin, CA
Bid Date: Nov 17 2025
Rocklin, CA
Bid Date: Dec 09 2025
Rocklin, CA
Bid Date: Sep 24 2025
Rocklin, CA
--
Rocklin, CA
Bid Date: Aug 05 2025
Rocklin, CA
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
