BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 23, 2025 at 8:00 PM

Updated September 24, 2025

Site work and paving for a sidewalk / parking lot in Union Township, Ohio. Conceptual plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

MIA-571 Crosswalks PID No.124454 Village of West Milton The services include preparation of construction contract plans for Enhanced Crosswalks on State Route 571 in Miami County with a project length of approximately 0.009 miles. The services include preparation of construction contract plan and right of way plans for 2 new crosswalks, including but not limited to ADA ramps, safety islands, warning signage and devices, and pavement markings along State Route 571 (Hayes Street). 1 location will be at the intersection of State Route 571 and North Jay Street, and 1 location will be at the intersection of State Route 571 and Stone Meadows Boulevard. Some additional 5-foot sidewalks will be needed at the Stone Meadows location. Estimated Construction Cost: $665,478.00 Prequalification Requirements for This Agreement Are Listed Below. For All Prequalification Categories Other Than Financial Management System Evaluation the Requirement May Be Met by the Prime Consultant or a Subconsultant. Also, Please Note That Only Individuals (Not Firms) Are Prequalified for Right of Way Acquisition Services. In Instances Where Prequalification for These Services is Required, a Prequalified Individual, Either Employed by the Prime Consultant or a Subconsultant, Must Be Named in Order To Meet the Requirement. For Agreements That Require Prequalification in Financial Management System Evaluation, the Prime Consultant and All Subconsultants That Provide Engineering and Design Related Services Must Be Prequalified in This Category. It is anticipated that the selected Consultant will be authorized to proceed by December 2025. The plans are to be completed and on file with the Village of West Milton within Three (3) months from the date of authorization. The projected Sale Date for Construction is July 2028. Disadvantaged Business Enterprise (DBE) Participation Goal None OHDOT - RFP Engineering - Enhanced Crosswalks on State Route 571

Conceptual

Sidewalks / Parking Lot

$665,478.00

Public - State/Provincial

Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
329
Active Projects
191
Bidding Soon
2,264
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 1, 2025

Project location map

Hayes St, Union Township, OH


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.