Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 17, 2025 at 8:00 PM
Updated October 18, 2025
This is a service / maintenance or supply contract in Wheeling, Illinois. Contact the soliciting agency for additional information.
The Village of Wheeling invites you to bid on an anticipated contract for Creek & Waterway, Tree Trimming and Removal Services (hereinafter referred to as the "Project"). The Project consists of maintenance activities that provide for tree pruning, tree removal and brush clearing along the Buffalo Creek, Wheeling Drainage Ditch, Camp McDonald Creek, Echo Lake and William Rogers Memorial Diversion Channel as directed by the Director of Public Works or his/her representative. The scope of the Project shall include all equipment, materials, labor, training, warranties and construction and/or installation services necessary to implement the contemplated construction. The Village of Wheeling reserves the right to waive any irregularities, technicalities, informalities, and other nonmaterial variances contain in any Bid Proposal and to reject all Bids. The Village reserves the right to hold any received Bid Proposal for a period of ninety (90) days from the opening date set forth above. BID SECURITY: Yes, 10% of Bid (Total of Option A, B and C) CONTRACT SECURITY: The successful Bidder will be required to provide performance and payment bonds covering the full amount of the Contract Price or Contract Sum securing full and faithful performance of the Contract and the payment for all labor material furnished by the Bidder or anyone furnishing such under the Bidder's contract or a subcontract of any tier. The successful Bidder will also be required to comply with the requirements under Illinois and federal law applicable to a public works project. The Village of Wheeling project manager is Jeff Wolfgram, Superintendent of Utility Division, and can be reached by email at jwolfgram@wheelingil.gov regarding the project
Post-Bid
Roads / Highways
Public - City
Service, Maintenance and Supply
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 17, 2025
November 17, 2025
Multiple Locations, Wheeling, IL
Related To This Project
Wheeling, IL
Bid Date: Nov 13 2025
Wheeling, IL
Bid Date: Oct 30 2025
Wheeling, IL
Bid Date: Dec 19 2025
Wheeling, IL
--
Wheeling, IL
Bid Date: Nov 24 2025
Wheeling, IL
Bid Date: Dec 09 2025
Wheeling, IL
Bid Date: Jan 13 2026
Wheeling, IL
Bid Date: Jan 22 2026
Wheeling, IL
Bid Date: Oct 30 2025
Wheeling, IL
Bid Date: Oct 23 2025
Wheeling, IL
Bid Date: Jun 07 2021
Wheeling, IL
Bid Date: Sep 09 2025
Wheeling, IL
Bid Date: Jul 28 2025
Wheeling, IL
Bid Date: Aug 06 2025
Wheeling, IL
Bid Date: Jul 09 2025
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
