Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 17, 2025 at 8:00 PM
Updated November 7, 2025
Demolition, site work, paving, renovation and addition to a mixed-use development in Saint Paul, Minnesota. Completed plans call for the addition of a one-story above grade power facility; for the demolition of a power facility; for the renovation of a power facility; for site work for a power facility; sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.
This project builds a new one story addition onto Concourse C at Terminal 1 between gate C3 and C4 and on Concourse G extends an electrical substation and replaces equipment. Civil work will include testing and disposal of contaminated soils, traffic control and perimeter security, pavement removal and replacement (airside and landside) , pedestrian ramp and stair removal and replacement, curb and gutter removal and replacement, sanitary sewer, watermain, and signing and pavement markings, excavation, backfilling, fuel pump and fuel tank removals, and building demolition. Construction will include waterproofing, concrete work, masonry, structural steel framing and cold formed metal framing, metal wall panels, doors and a window, roofing, spray fireproofing, asbestos abatement, gyp board work, ceilings, and painting. Mechanical will include installation of VAVs, Fan Coil Units, Unit Heaters, and associated piping, ductwork, and controls. Plumbing will include installation of sanitary piping, flammable waste systems, water meter replacement and piping, miscellaneous fixtures and floor drains, and roof drains. Electrical will include re-routing of existing feeder to passenger boarding bridges, installation of panelboards and transformers, re-routing of existing circuits to replace and relocate panelboards, installation of duct banks for future use, installation of lighting fixtures and associated controls, and installation of data and access controls systems. At Concourse G, the electrical work includes removal of existing substation and replacing it with new substation line including medium voltage switch, medium voltage to low voltage transformer, installation of Automatic Transfer Switch, installation of panelboards and transformers. Existing medium voltage feeder, branch feeders and branch circuits will be extended to new equipment locations. Data drops and fire alarm detection and notification is also included in the scope. Question Deadline 10/09/2025 No oral interpretation will be made to any Bidder as to the meaning of the specification or of the Drawings incorporated therein by reference or otherwise. Every request for such an interpretation shall be made in writing to Alliiance, David Bower (dbower@alliiance.com), MSP International Airport, 4300 Glumack Drive, Suite LT-3191, St. Paul, MN 55111. Any inquiry received (7) or more days prior to the time for opening of bids will be considered. The intent of the drawings and specifications is to prescribe a complete project of work or improvement. The Contract shall be based upon and include by reference the drawings and specifications, and all addenda as hereinafter provided, and all bids must be based upon a full compliance therewith.
Bid Results
Power Plant
$10,398,289.00
Public - State/Provincial
Addition, Demolition, Paving, Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 16, 2025
November 18, 2025
3412 Glumack Dr, Saint Paul, MN
Related To This Project
Saint Paul, MN
Bid Date: Nov 12 2025
Saint Paul, MN
Bid Date: Nov 05 2025
Saint Paul, MN
Bid Date: Oct 22 2025
Saint Paul, MN
Bid Date: Oct 28 2025
Saint Paul, MN
Bid Date: Oct 16 2025
Saint Paul, MN
Bid Date: Oct 23 2025
Saint Paul, MN
Bid Date: Oct 08 2025
Saint Paul, MN
Bid Date: Oct 14 2025
Saint Paul, MN
Bid Date: Nov 04 2025
Saint Paul, MN
Bid Date: Sep 25 2025
Saint Paul, MN
Bid Date: Oct 08 2025
Saint Paul, MN
--
Saint Paul, MN
--
Saint Paul, MN
Bid Date: Sep 25 2025
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
