BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published December 23, 2025 at 7:00 PM

Updated December 24, 2025

Renovation of a fire / police facility in Durham, Connecticut. Completed plans call for the renovation of a fire / police facility.

Provide labor, material, and equipment: 1. 1 Oil Fired Boiler 2. Brand of primary Boiler shall be Well-McLain or equivalent 3. Beckett Oil Burner or equivalent 4. 2 circular pumps (one being a backup) The work will consist of the following: 1. Mobilization on site 2. Install temporary protection as needed 3. Remove existing boiler and dispose of material 4. Patch/Parge existing masonry (if needed) 5. Install new oil boiler 6. Install associated plumbing, glycol, temperature gauges and expansion tank 7. Install structural concrete grout and masonry if needed 8. Bidder shall be responsible for obtaining all permits required and any associated costs 9. New oil lines from boiler to concrete oil tank located outside 10. All work must be completed by December 5, 2025 Question Deadline 10/03/2025 All requests for additional information and/or questions should be directed, in writing, to Charlie Bedo , Facilities Director, at cbedo@townofdurhamct.org Bid Bond/Cashier's Check (5% of total amount of bid) Labor and Materials Payment Bond will be required equal to the value of the contract (100%)

Award

Fire / Police

$44,670.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1,046
Active Projects
542
Bidding Soon
5,289
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 14, 2025

November 13, 2025

Project location map

41 Main St, Durham, CT

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.