Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published November 5, 2025 at 7:00 PM
Updated November 6, 2025
Site work and renovation of a civil project in Atlanta, New York. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.
ATL Report No. BD184E-01-06-24 This project generally involves the; replacement +/- 3,140 LF of existing 8" watermain along Wayland St (SR21) with 8" PVC; installation of +/- 1,810 LF of 8" watermain along Beecher Street (CR39A) with 8" PVC and HDPE; installation of +/- 730 LF of 10" PVC and HDPE water main along University Ave (CR39); and +/- 1,170 LF of 8" PVC and HDPE along Maple Ave. The watermain work also includes new ancillary hydrants, main line valves, water services, and connections to all side streets. This project also includes replacement of three pressure reducing valve pits with a small PRV building. Also, the project includes re-sealing and cleaning the water storage tank and drainage improvements at the tank site. Also, the project includes construction of a new chlorine storage building adjacent to the existing well house, and well house improvements for the addition of orthophosphate for hardness control and other miscellaneous improvements. Project Duration 240 Days SCOPE OF SERVICES/SPECIFICATIONS: A. Scope of Services The Contractor shall apply a Cementitious sprayed-on pipe liner on the inside of the existing corrugated metal pipe and repair spalled areas in existing concrete liner. The work shall include; 1. Cleaning and preparing the existing pipe, 2. Removing and properly disposing of any and all debris/silt/rock inside the pipe, 3. Installing and removing all environmental controls, 4. Installing and removing cofferdams and/or diversions, 5. Filling and stabilizing voids surrounding the pipe with a product from the Approved Materials List, Attachment J. 6. Application of the liner, 7. Inspection and testing of liner, 8. Application of material to repair spalls in existing concrete pipe, 9. Water quality testing, 10. Furnishing and placing seed in disturbed areas, 11. Furnishing and placing erosion control matting in disturbed areas, 12. All materials, tools, labor, traffic control, and incidentals required to perform the work. Note 1: Pipe has existing concrete liner in the bottom quarter of pipe for the entire length. Contractor shall apply spray-on lining on the remaining area of pipe. Construction joint where new lining and existing lining meets shall be cleaned before placement of new liner and sealed with a material from the VDOT Approved Materials List after placement of new liner. Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: A. MRB Group Contact: Gregory Hotaling, PE, greg.hotaling@mrbgroup.com Question Deadline 10/08/2025
Award
Water / Sewer
$2,233,895.00
Public - City
Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 17, 2025
November 17, 2025
19 Main St, Atlanta, NY
Related To This Project
Atlanta, NY
Bid Date: Oct 17 2025
Atlanta, NY
Bid Date: Oct 17 2025
New York, NY
--
Buffalo, NY
Bid Date: Sep 17 2025
Stony Brook, NY
Bid Date: Sep 17 2025
Rochester, NY
--
Queensbury, NY
Bid Date: Oct 07 2025
New York, NY
--
New York, NY
--
Poughkeepsie, NY
Bid Date: Mar 26 2026
Rome, NY
Bid Date: Sep 29 2025
Locust Valley, NY
Bid Date: Oct 03 2025
Canandaigua, NY
Bid Date: Oct 17 2025
Bronx, NY
Bid Date: Sep 19 2025
Oneonta, NY
Bid Date: Oct 07 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed
