BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 21, 2025 at 7:00 PM

Updated November 22, 2025

Site work for a water / sewer project in Huntington, West Virginia. Completed plans call for site work for a water / sewer project.

Bids submitted by Bidders who do not attend the pre bid conference will be considered unresponsive and will not be opened. A pre bid conference will be held jointly with pre bid conference for the 4th Street Pump Station Improvements, Contract 2 2025. Following the conclusion of the pre bid conferences, OWNER and ENGINEER will facilitate a site visit to the Project site. Refer to Section 00 21 13-Instructions to Bidders, Article 5.04, for additional site visit information. The Project includes the following Work: Rehabilitation of the existing 13th Street West Pump Station facility including demolition of existing pump station above grade components, internal dry well components, pumping equipment and appurtenances, and electrical control and instrumentation components; modifications to convert the existing dry well substructure to a submersible wet well; installation of new pumping equipment and appurtenances, electrical control and instrumentation components; new control building; standby generator; installation of a combined sewer regulator structure and sewer improvements; and completion of site improvements and restoration. The Bid must be accompanied by Bid security made payable to OWNER in an amount of 5% of the Bidder's maximum Bid price. OWNER reserves the right to reject any or all Bids, to waive any technicality, and to accept any Bid which it deems advantageous. All Bids shall remain subject to acceptance for 90 days after the time set for receiving Bids. SRF NO. C-544790 Question Deadline 10/09/2025: All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. All requests for interpretation must be received at least seven days prior to the day set for receiving Bids.

Bid Results

Water / Sewer

$25,381,000.00

Public - City

Site Work

65

35

30

9

Subscribe For Documents

34 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
98
Active Projects
39
Bidding Soon
829
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 20, 2025

December 22, 2025

Project location map

Multiple Locations, Huntington, WV

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.