BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 14, 2025 at 7:00 PM

Updated November 15, 2025

Renovation of an industrial development in Santa Ana, California. Completed plans call for the renovation of a industrial development.

County of Orange ("County") is soliciting proposals from qualified Contractors ("Respondents"), to provide Construction Manager at Risk ("CMAR") Services for CMAR - COC B Switchgear Replacement Project ("Project") located at 1300 S. Grand Ave, Building B Santa Ana, CA 92705. The awarded proposal ("Contract") will provide a negotiated Guaranteed Maximum Price (GMP) for Design Phase Services between the County and the selected Respondent ("CMAR Entity" or "CMARE"). The County may, at its sole discretion, exercise its option to negotiate a GMP for the construction of the Project with the CM and will return to the Board of Supervisors for authorization to execute a construction services contract. All questions/requests for interpretation are due: Wednesday, September 24, 2025 by 2:00 pm Pacific Time. All questions and inquiries related to this RFP must be submitted via the County's eProcurement Portal. Respondents are not to contact other County personnel with any questions or clarifications concerning this RFP. County Procurement Services will provide all official communication concerning this RFP. Any response relevant to this RFP other than through or approved by County Procurement Services is unauthorized and will be considered invalid. Background The County of Orange, OC Public Works (hereinafter referred to as "County"), is soliciting proposals from qualified firms (hereinafter referred to as "Respondents") for Construction Manager at Risk (CMAR) for COC B Switchgear Replacement. Respondents must meet the minimum qualifications and requirements as set forth within the RFP and be capable of providing services identified in the Scope of Work herein. Prospective Respondents are advised to carefully review the attached RFP solicitation package and complete/upload their proposals per Section I "Introduction and Instructions to Respondents" and Section II "Construction Manager at Risk (CMAR) for COC B Switchgear Replacement Scope of Work & Response Requirements" of the RFP package.

Award

Industrial

$1,900,000.00

Public - County

Renovation

17

19

7

Subscribe For Documents

39 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
654
Active Projects
281
Bidding Soon
3,716
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 8, 2025

June 8, 2026

Project location map

1300 S Grand Ave, Santa Ana, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.