BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 31, 2025 at 8:00 PM

Updated November 1, 2025

Site work and paving for a mixed-use development in Benton City, Washington. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

As of October 31, 2025, there was one submission for this RFQ, but a contract has not been finalized. A timeline for construction has not been established. This agreement will be for approximately 24 months in duration with the option for Benton City to extend it for additional time and money if necessary.[SW1] The contract type and method of payment for these projects are "Cost Plus Fixed Fee". The City of Benton City reserves the right to retain the services of the successful firm for any potential future phases (Right of Way, Construction Management[SW2] ) associated with these projects A consultant will be considered for the following projects: Horne Drive/SR225 Sidewalk Installation and Benton City Babs-7th Roundabout Design. The City of Benton City reserves the right to amend terms of this "Request for Qualifications" (RFQ) to circulate various addenda, or to withdraw the RFQ at any time, regardless of how much time and effort consultants have spent on their responses. Project Descriptions[SW3] Horne Drive/SR225 Sidewalk Installation: The work to be performed by the CONSULTANT consists of preparing preliminary engineering (PE) design for sidewalks and related infrastructure along SR225 spanning from Grace Avenue intersection to Ki-Be Road respectively, including but not limited to; speed feedback signs, high-visibility crosswalks, rectangular rapid flashing beacons, ADA curb ramps, and sidewalk with buffer. Environmental documentation and preparation of permit applications will be required as well as a determination of existing right-of-way. Design to be completed by March 31, 202[SW4] 6. This project is state funded and DBE goals do not apply. Potential future phases may include Right of Way and Construction Management. The HORNE DRIVE/SR225 SIDEWALK INSTALLATION Project is supported with funding from Washington's Climate Commitment Act. The CCA supports Washington's climate action efforts by putting cap-and-invest dollars to work reducing climate pollution, creating jobs, and improving public health. Information about the CCA is available at online. Benton City Babs-7th Roundabout Design: The work to be performed by the CONSULTANT consists of preparing preliminary engineering (PE) design for a roundabout intersection located at the intersection of Babs Avenue and 7th Street. Consultant to provide complete set of plans, specifications and estimates as final deliverable for the design phase of this project. Potential future phases may include Right of Way and Construction Management. [SW5] DBE goals established for this project are 13%. Design to be completed by December 31, 2027. Evaluation Criteria Submittals will be evaluated and ranked based on the following criteria: 1) Qualification of Proposed Project Manager 2) Qualifications/Expertise of Firm 3) Ability to meet schedule 4) Familiarity with Benton City 5) Familiarity with WSDOT/FHWA standards 6) Past Performance/References The top three rated consulting firms will be selected for interviews by the review panel. Submittal of Statement of Qualifications and Contact Person The SOQ shall not exceed fifteen (15) single sided pages; excluding the front and back covers. Any questions regarding this project should be directed to Nathan Radach, at 509-588-3322 ext. 114. The method of Contractor Selection has not been Determined at this time.

Conceptual

Roads / Highways

$200,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
16
Active Projects
2
Bidding Soon
195
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 2, 2026

Project location map

Multiple Locations, Benton City, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.