Site work and paving for a mixed-use development in Benton City, Washington. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.
As of October 31, 2025, there was one submission for this RFQ, but a contract has not been finalized. A timeline for construction has not been established. This agreement will be for approximately 24 months in duration with the option for Benton City to extend it for additional time and money if necessary.[SW1] The contract type and method of payment for these projects are "Cost Plus Fixed Fee". The City of Benton City reserves the right to retain the services of the successful firm for any potential future phases (Right of Way, Construction Management[SW2] ) associated with these projects A consultant will be considered for the following projects: Horne Drive/SR225 Sidewalk Installation and Benton City Babs-7th Roundabout Design. The City of Benton City reserves the right to amend terms of this "Request for Qualifications" (RFQ) to circulate various addenda, or to withdraw the RFQ at any time, regardless of how much time and effort consultants have spent on their responses. Project Descriptions[SW3] Horne Drive/SR225 Sidewalk Installation: The work to be performed by the CONSULTANT consists of preparing preliminary engineering (PE) design for sidewalks and related infrastructure along SR225 spanning from Grace Avenue intersection to Ki-Be Road respectively, including but not limited to; speed feedback signs, high-visibility crosswalks, rectangular rapid flashing beacons, ADA curb ramps, and sidewalk with buffer. Environmental documentation and preparation of permit applications will be required as well as a determination of existing right-of-way. Design to be completed by March 31, 202[SW4] 6. This project is state funded and DBE goals do not apply. Potential future phases may include Right of Way and Construction Management. The HORNE DRIVE/SR225 SIDEWALK INSTALLATION Project is supported with funding from Washington's Climate Commitment Act. The CCA supports Washington's climate action efforts by putting cap-and-invest dollars to work reducing climate pollution, creating jobs, and improving public health. Information about the CCA is available at online. Benton City Babs-7th Roundabout Design: The work to be performed by the CONSULTANT consists of preparing preliminary engineering (PE) design for a roundabout intersection located at the intersection of Babs Avenue and 7th Street. Consultant to provide complete set of plans, specifications and estimates as final deliverable for the design phase of this project. Potential future phases may include Right of Way and Construction Management. [SW5] DBE goals established for this project are 13%. Design to be completed by December 31, 2027. Evaluation Criteria Submittals will be evaluated and ranked based on the following criteria: 1) Qualification of Proposed Project Manager 2) Qualifications/Expertise of Firm 3) Ability to meet schedule 4) Familiarity with Benton City 5) Familiarity with WSDOT/FHWA standards 6) Past Performance/References The top three rated consulting firms will be selected for interviews by the review panel. Submittal of Statement of Qualifications and Contact Person The SOQ shall not exceed fifteen (15) single sided pages; excluding the front and back covers. Any questions regarding this project should be directed to Nathan Radach, at 509-588-3322 ext. 114. The method of Contractor Selection has not been Determined at this time.
Conceptual
Roads / Highways
$200,000.00
Public - City
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 2, 2026
Multiple Locations, Benton City, WA
Related To This Project
Benton City, WA
Bid Date: Oct 17 2025
Benton City, WA
Bid Date: Feb 13 2026
Benton City, WA
--
Benton City, WA
--
Benton City, WA
--
Benton City, WA
--
Benton City, WA
Bid Date: Jul 30 2025
Benton City, WA
--
Benton City, WA
--
Benton City, WA
--
Benton City, WA
--
Benton City, WA
Bid Date: Jan 07 2025
Benton City, WA
Bid Date: Dec 06 2024
Benton City, WA
Bid Date: Oct 31 2024
Benton City, WA
Bid Date: Sep 25 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.